Contractor · Specialty (solar, fire, telecom)
Complete Solar
177 building permits since 2019 in Rochester city, NH; Dover city, NH and Framingham city, MA, across 21 counties — $4,334,310 in reported job value over 115 permits that state one.
- Building permits
- 177
- Reported job value
- $4.3M
- Active
- 2019–2026
- Latest permit
- Aug 13, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Rochester city, NH18
- Dover city, NH16
- Framingham city, MA14
- Haverhill city, MA13
- Worcester city, MA11
- Plymouth town, MA9
- Bristol town, CT6
- Methuen city, MA5
- Everett city, MA5
- Marlborough city, MA5
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2019 | 6 |
| 2020 | 3 |
| 2021 | 3 |
| 2022 | 6 |
| 2023 | 121 |
| 2024 | 5 |
| 2025 | 25 |
| 2026 (YTD) | 6 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar143
- Electrical78
- Roofing20
- Remodels11
- Electric meters10
- Additions5
- HVAC3
- Battery storage3
- Windows & doors1
Permit types
As the building departments classify them.
- Electrical Permit31
- Building Permit16
- Res Solar14
- Electrical Alternate Energy Source12
- Building Permit (Minor)9
- Electrical Permit - RESIDENTIAL ONLY7
- Building6
- Building Permit: RESIDENTIAL Renovate or Remodel6
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 13, 2026 | Building Permit - Solar (PV) Permit for 1 & 2 Family | 37 photovoltaic PV modules roof mounted, 13.32 KWDC, Existing 125A Main Service Panel with 100A Main **PERMIT REVISED 1/9/2024. REVISED PERMIT LAYOUT. PANELS AL | Marlborough City | — |
| May 27, 2026 | Building Permit: RESIDENTIAL Renovate or Remodel | 11.070 kW residential solar system to be installed on roof | Haverhill City | $10,904 |
| May 14, 2026 | Electrical Permit - RESIDENTIAL ONLY | 11.070 kW residential solar system to be installed on roof, 27 panels total | Haverhill City | — |
| Apr 8, 2026 | Electrical Permit | 11.07 kW residential solar system to be installed on roof - 27 Panels | Fitchburg City | $19,926 |
| Mar 5, 2026 | Building Permit | 5.590 kW residential solar system to be installed on roof - 13 solar panels | Everett City | $10,062 |
| Mar 5, 2026 | Electrical Permit | 5.590 kW residential solar system to be installed on roof - 13 Solar Panels | Everett City | $10,062 |
| Dec 30, 2025 | Building Permit / Use and Occupancy | 10.56 kW PV Solar Installation - 24 Panels SYSTEM SUMMARY STC (10.56 kW DC / 7.68 kW AC) STC DC: (24) 440W = 10.56 kW STC AC: (24) 320W = 7.68 kW ? (24) JA SOLA | Fitchburg City | — |
| Dec 23, 2025 | Building Permit: RESIDENTIAL Renovate or Remodel | 8.8 kW residential solar system to be installed on roof | Haverhill City | $41,566 |
Permit status
Where its permits stand, as the departments report them.
- Completed74
- Active43
- Not stated17
- Stop work ordered10
- Issued9
- Closed7
- Void5
- Expired5
Also on file as
The same name elsewhere
- COMPLETE SOLAR INCRiverside city, CA1.3K
- COMPLETE SOLAR INCMarion County, OR611
- Complete Solar, Inc.Raleigh city, NC486
- COMPLETE SOLAR INCBroomfield County, CO121
- Complete Solar, INCPlainfield village, IL113
- COMPLETE SOLAR INCColumbus city, OH62
- Complete Solar IncRamsey city, MN47
- COMPLETE SOLARMilwaukee city, WI28
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.