Contractor · Electrical

Greg Andersen

11 building permits since 2025 in Mesa city, AZ and Peoria city, AZ — $209,761 in reported job value over 7 permits that state one.

Building permits
11
Reported job value
$209.8K
Active
2025–2026
Latest permit
Jun 17, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Mesa city, AZ7
  • Peoria city, AZ4

Permits by year

By issue date (application date where there is none).

02.55
5
20252026*
* 2026 is year to date.
View as table
YearPermits
20255
2026 (YTD)2

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar10
  • Battery storage7
  • Electrical7
  • Electric meters7

Permit types

As the building departments classify them.

  • Electrical7
  • Residential4

Recent permits

The 7 newest on file.

DateTypeWorkJurisdictionJob value
Jun 17, 2026ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE Mesa$26,000
Jun 16, 2026ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY AND ONE POWERWALL3 EXPANSION PACK. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTMesa$33,761
Sep 30, 2025ElectricalPERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILMesa$22,000
Sep 4, 2025ElectricalPERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMEDMesa$28,000
Jul 24, 2025ElectricalPERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY AND ONE TESLA POWERWALL 3 DC EXPANSION BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTUMesa$55,000
Jun 23, 2025ElectricalPERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILMesa$25,000
Apr 2, 2025ElectricalPERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILMesa$20,000

Permit status

Where its permits stand, as the departments report them.

  • C/o issued7
  • Finaled3
  • Expired1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.