Contractor · Electrical
GOLDEN WIRE ELECTRIC INC.
11 building permits since 2024 in San Leandro city, CA; Alameda County, CA and Marin County, CA, across 4 counties — $1,000 in reported job value over 1 permits that state one.
- Building permits
- 11
- Reported job value
- $1K
- Active
- 2024–2026
- Latest permit
- Mar 11, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- San Leandro city, CA6
- Alameda County, CA1
- Marin County, CA1
- Berkeley city, CA1
- San Mateo County, CA1
- Saratoga city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2024 | 1 |
| 2026 (YTD) | 10 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical11
- Electric meters2
- Plumbing1
- Generators1
Permit types
As the building departments classify them.
- Electrical10
- RESIDENTIAL1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 11, 2026 | Electrical | Replace existing 100-amp main service panel due to hoa insurance company mandate. No changes to layout. Replacing the 100 amp interior subpanel located in hallw | San Leandro City | — |
| Mar 2, 2026 | Electrical | Upgrade main electrical panel to 200 amps | Alameda County | — |
| Feb 23, 2026 | Electrical | Replace existing federal pacific (fpe) 100amp main service panel, same-ampacity modern panel due to documented safety hazards and breaker failure risks. Work in | San Leandro City | — |
| Feb 4, 2026 | Electrical | Emergency corrective work to restore electrical service after pg&e de-energized. Verify existing 200a, 2-meter main service panel is code compliant. Correct gro | Berkeley City | — |
| Feb 4, 2026 | Electrical | Is this a residential or commercial project?: residential are you working on lighting like for like?: yes will there be any changes to the existing walls, ceili | San Mateo County | — |
| Jan 30, 2026 | Electrical | Replace existing 125amp federal pacific sub-panel (rated at 70amps) with siemens 125amp sub-panel rated at (70amps). Same location in downstairs hallway. | San Leandro City | — |
| Jan 23, 2026 | Electrical | — | Saratoga City | — |
| Jan 2, 2026 | Electrical | Replace existing federal pacific (fpe) main service panel, same-ampacity modern panel due to documented safety hazards and breaker failure risks. -- 100 amp sin | San Leandro City | — |
Permit status
Where its permits stand, as the departments report them.
- Finaled7
- Active2
- Not stated2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.