Contractor · Electrical
GOLDEN BAY ELECTRIC
11 building permits since 2024 in Novato city, CA; Marin County, CA and Berkeley city, CA, across 2 counties — $26,500 in reported job value over 4 permits that state one.
- Building permits
- 11
- Reported job value
- $26.5K
- Active
- 2024–2026
- Latest permit
- Aug 29, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Novato city, CA5
- Marin County, CA4
- Berkeley city, CA1
- Oakland city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2024 | 2 |
| 2025 | 1 |
| 2026 (YTD) | 8 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical9
- Electric meters1
Permit types
As the building departments classify them.
- Electrical7
- RESIDENTIAL3
- COMMERCIAL1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 29, 2026 | RESIDENTIAL | — | Marin County | $3,500 |
| Feb 23, 2026 | Electrical | Remove and replace existing zinsco sub panel. New panel will be installed on adjacent wall and existing enclosure will remain as a junction box. | Novato City | — |
| Feb 9, 2026 | Electrical | Replace existing zinsco sub panel located in closet to new wall location in garage. Old panel will remain as a junction box. | Novato City | — |
| Feb 2, 2026 | Electrical | Service panel upgrade to 200a. Removal of existing fuse box and exposed knob and tube wiring in crawl space and attic. Installation of new circuits as necessary | Oakland City | — |
| Jan 28, 2026 | Electrical | Remove and replace existing zinsco sub panel. Currently the sub panel is located inside the closet new panel will be installed on adjacent wall. Existing zinsco | Novato City | — |
| Jan 21, 2026 | Electrical | Remove existing zinsco panel. Install new ul listed sub panel. Location will remain the same. | Novato City | — |
| Jan 21, 2026 | Electrical | Remove existing zinsco sub panel in closet and relocate to the adjacent wall. Install new sub panel and extend circuits to new panel location approximately 5ft. | Novato City | — |
| Jan 12, 2026 | Electrical | Install new 50 amp 240 v ckt for level 2 e.v. Charger. | Berkeley City | — |
Permit status
Where its permits stand, as the departments report them.
- Finaled6
- Not stated4
- Active1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.