Contractor · Electrical

GOLDEN BAY ELECTRIC

11 building permits since 2024 in Novato city, CA; Marin County, CA and Berkeley city, CA, across 2 counties — $26,500 in reported job value over 4 permits that state one.

Building permits
11
Reported job value
$26.5K
Active
2024–2026
Latest permit
Aug 29, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Novato city, CA5
  • Marin County, CA4
  • Berkeley city, CA1
  • Oakland city, CA1

Permits by year

By issue date (application date where there is none).

048
8
202420252026*
* 2026 is year to date.
View as table
YearPermits
20242
20251
2026 (YTD)8

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical9
  • Electric meters1

Permit types

As the building departments classify them.

  • Electrical7
  • RESIDENTIAL3
  • COMMERCIAL1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 29, 2026RESIDENTIAL—Marin County$3,500
Feb 23, 2026ElectricalRemove and replace existing zinsco sub panel. New panel will be installed on adjacent wall and existing enclosure will remain as a junction box.Novato City—
Feb 9, 2026ElectricalReplace existing zinsco sub panel located in closet to new wall location in garage. Old panel will remain as a junction box.Novato City—
Feb 2, 2026ElectricalService panel upgrade to 200a. Removal of existing fuse box and exposed knob and tube wiring in crawl space and attic. Installation of new circuits as necessaryOakland City—
Jan 28, 2026ElectricalRemove and replace existing zinsco sub panel. Currently the sub panel is located inside the closet new panel will be installed on adjacent wall. Existing zinscoNovato City—
Jan 21, 2026ElectricalRemove existing zinsco panel. Install new ul listed sub panel. Location will remain the same.Novato City—
Jan 21, 2026ElectricalRemove existing zinsco sub panel in closet and relocate to the adjacent wall. Install new sub panel and extend circuits to new panel location approximately 5ft.Novato City—
Jan 12, 2026ElectricalInstall new 50 amp 240 v ckt for level 2 e.v. Charger.Berkeley City—

Permit status

Where its permits stand, as the departments report them.

  • Finaled6
  • Not stated4
  • Active1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.