Contractor · Windows, doors & glazing

GARCIA SANCHEZ ANDRADE LLC

11 building permits since 2019 in Santa Cruz County, CA.

Building permits
11
Reported job value
—
Active
2019–2020
Latest permit
Feb 3, 2020

Where it works

Counties shaded by permits filed there.

Permits by county, fewer to more

Busiest jurisdictions

  • Santa Cruz County, CA11

Permits by year

By issue date (application date where there is none).

0510
10
20192020
View as table
YearPermits
201910
20201

Type of work

Permits describing each kind of work; one permit can cover several.

  • Windows & doors6
  • Electrical5
  • Kitchens1
  • Remodels1
  • Roofing1
  • Plumbing1
  • Water heaters1

Permit types

As the building departments classify them.

  • Building11

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Feb 3, 2020BuildingConstruction Change Document #1 to B-192103, to include plans and details to replace stairway at Bldg. C Units 96 & 98.Santa Cruz County—
Oct 22, 2019BuildingReplace in kind 5 windows & 1 sliding glass door at unit 66 & 3 bedroom windows at unit 84 of an existing apartment building. Bedroom windows need 5.7 sq ft minSanta Cruz County—
Sep 11, 2019BuildingRemove existing aluminum wire & rewire with copper at existing apartment unit 66.Santa Cruz County—
Aug 6, 2019BuildingRepair fire damaged Units at existing apartment building C Units 96 & 98, remove & replace sheetrock, relocate electrical subpanels, replace forced air unit andSanta Cruz County—
Jul 3, 2019BuildingRemove existing aluminum wire & rewire with copper at an existing apartment Unit 80. Install listed smoke detectors and carbon monoxide alarms or combination smSanta Cruz County—
Apr 23, 2019BuildingRemove existing aluminum wire, re-wire with cooper at an existing apartment unit #78. Install listed smoke detectors and carbon monoxide alarms or combination sSanta Cruz County—
Apr 23, 2019BuildingReplace (3) windows at upper floor Unit # 82 Install listed smoke detectors and carbon monoxide alarms or combination smoke and carbon monoxide detectors/alarmsSanta Cruz County—
Apr 23, 2019BuildingReplace (12) windows at (2) upper floor Units # 66 & # 70 and (2) lower floor Units # 64 & # 68, three windows per Unit. At an existing (4) Unit apartment buildSanta Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed9
  • Active2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.