FULFILL POWER INC.

11 building permits since 2024 in Riverside County, CA; Brea city, CA and Burbank city, CA, across 4 counties — $24,000 in reported job value over 1 permits that state one.

Building permits
11
Reported job value
$24K
Active
2024–2026
Latest permit
Mar 11, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Riverside County, CA3
  • Brea city, CA1
  • Burbank city, CA1
  • Hemet city, CA1
  • Lancaster city, CA1
  • Los Angeles city, CA1
  • Madera city, CA1
  • Norwalk city, CA1
  • Temecula city, CA1

Permits by year

By issue date (application date where there is none).

048
7
202420252026*
* 2026 is year to date.
View as table
YearPermits
20241
20253
2026 (YTD)7

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar8
  • Electrical8
  • Battery storage6

Permit types

As the building departments classify them.

  • Electrical8
  • BLDG - Building (R)1
  • RSOLARAPP1
  • Solar Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Mar 11, 2026ElectricalRooftop mounted solar energy system. Pv+st. 23 q.tron blk m-g2+ 430 solar modules. 1 1707000-xx-y {11.5kw} inverter. 1 1707000-xx-y {11.5kw} ess + 1 1807000-xx-Brea City—
Feb 25, 2026ElectricalSa20260225-13378-56-12257-aHemet City—
Jan 30, 2026ElectricalBel2600135 (1) tesla powerwall 3, 13.5kwhRiverside County—
Jan 13, 2026ElectricalBel2600074) energy storage system - 3tesla powerwall 3, 13.5kwh. 40.5kwh total.Riverside County—
Jan 13, 2026ElectricalSymbium-project_7575a32b-5c02-486d-8723-12647b439872:install 18 pv modules (7.74kw) with tesla inc. Inverter; install 1 ess unit, location = outdoors; install 1Lancaster City—
Jan 12, 2026ElectricalBxx2600053) pv roof mount solar 24.94kwdc/22.78kw ac, 58 modules, 3 inverters, 1 load center. No mpu.Riverside County—
Jan 9, 2026ElectricalE-plan] changes to an approved pv+ess set for relocation of equipment. *** applicant work description below: *** installing 45 modules and 2 tesla batteries.Los Angeles City—
Apr 21, 2025BLDG - Building (R)Online. Rooftop Solar with 20 modules, 20 micro inverters, (2) 5p batteries and partial backup. Jemiola residenceTemecula City—

Permit status

Where its permits stand, as the departments report them.

  • Finaled6
  • Active2
  • Closed1
  • Issued1
  • Not stated1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.