Contractor · Specialty (solar, fire, telecom)

FELDNER FREDRIC R SUCCESSOR TRUSTEE

11 building permits since 2011 in Santa Cruz County, CA.

Building permits
11
Reported job value
—
Active
2011–2025
Latest permit
May 15, 2025

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Santa Cruz County, CA11

Permits by year

By issue date (application date where there is none).

024
4
2011201320152025
View as table
YearPermits
20111
20124
20131
20141
20151
20221
20252

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar4
  • Roofing3
  • Electrical2
  • Windows & doors2
  • Grading & excavation1
  • Bathrooms1
  • Demolition1

Permit types

As the building departments classify them.

  • Building11

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
May 15, 2025BuildingNote state license type and must have W/C Ins. Tear-off or overlay roof at an existing structure <600 sq ft, install new sheathing as required with class-B or bSanta Cruz County—
Apr 22, 2025BuildingNote state license type and must have W/C Ins. Tear-off or overlay roof at an existing structure, install new sheathing as required with class-B or better approSanta Cruz County—
Apr 13, 2022BuildingDemolition permit to remove the gazebo, remove lighting, electrical and any equipment, also return the existing Handicapped parking stall back to an ADA approveSanta Cruz County—
Jan 6, 2015BuildingChange order to B-142231 to include revise 'Hopmaster tank, revise bar at upper level 'tasting prep' room, install exterior condenser, walk-in cooler detailed aSanta Cruz County—
Jul 3, 2014BuildingConvert an existing 3,143 sqft, 2-story commercial building to a micro brewery and tasting room and install new signage. See 131252Santa Cruz County—
Apr 22, 2013BuildingRERF: Tear off roofing at an existing 5 un it complex and install new sheathing if required and class B or better (typ) roofing. Replace (10) windows“Install liSanta Cruz County—
Sep 24, 2012BuildingCO: Change Order to B-111509 to eliminate sloping walkway.Santa Cruz County—
May 23, 2012BuildingCO: Change Order to B-111509 to revise upper level interior wall(shorten).Santa Cruz County—

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.