Contractor · Electrical
ENTERPRISE SOLAR LLC
11 building permits since 2025 in Los Angeles city, CA; Riverside city, CA and San Bernardino County, CA, across 5 counties — $81,500 in reported job value over 2 permits that state one.
- Building permits
- 11
- Reported job value
- $81.5K
- Active
- 2025–2026
- Latest permit
- Jul 2, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Los Angeles city, CA4
- Riverside city, CA2
- San Bernardino County, CA1
- Burbank city, CA1
- Camarillo city, CA1
- Oceanside city, CA1
- San Diego city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2025 | 2 |
| 2026 (YTD) | 9 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical7
- Solar6
- Roofing1
- Electric meters1
Permit types
As the building departments classify them.
- Electrical6
- Residential2
- BLD SOLAR PV RES - SYSTEM ADD-ON1
- RESIDENTIAL ROOFTOP SOLAR SYSTEM1
- Solar1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jul 2, 2026 | Solar | Install 1 ESS unit on an exterior wall. SYMBIUM-project_4fcbd98c-f6af-4688-a411-e34c7ccc1bb1 | Burbank City | — |
| Jun 16, 2026 | Residential | UPGRADE ELECTRICAL SERVICE METER PANEL TO 200 AMP | Riverside City | $1,500 |
| Mar 20, 2026 | Electrical | Msp change out | 200a like for like | San Bernardino County | — |
| Mar 12, 2026 | Electrical | Eplan) pc only. Main service panel and solar equipment have changed location on property to meet ladwp requirements on electrical drop attn plan checker: matthe | Los Angeles City | — |
| Mar 11, 2026 | Electrical | New 200 amp sub panel, with 125 amp main breaker. In existing location | Los Angeles City | — |
| Mar 5, 2026 | Electrical | New 200 amp sub panel de rated to a 125 amp main breaker | Los Angeles City | — |
| Feb 19, 2026 | Electrical | — | San Diego City | — |
| Feb 18, 2026 | Electrical | Eplan) pv1 for installation of roof mounted solar panels. Pv system includes 8 modules with 8 microinverters and 1 combiner box connected to existing main servi | Los Angeles City | — |
Permit status
Where its permits stand, as the departments report them.
- Active5
- Issued3
- Finaled2
- Expired1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.