Contractor · Electrical

ENDURANCE SOLAR & ENGINEERIN

11 building permits since 2010 in Boulder city, CO — $161,000 in reported job value over 11 permits that state one.

Building permits
11
Reported job value
$161K
Active
2010–2015
Latest permit
Feb 18, 2015

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Boulder city, CO11

Permits by year

By issue date (application date where there is none).

024
4
201020112012201320142015
View as table
YearPermits
20102
20111
20124
20131
20141
20152

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar11
  • Electrical11
  • Roofing3

Permit types

As the building departments classify them.

  • Electrical Permit11

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Feb 18, 2015Electrical PermitInstallation of 6.867 kW flush mount PV system on south roof pitch of a single family detached dwelling.Boulder$24,500
Feb 18, 2015Electrical PermitInstallation of a 2.0 kW flush mount PV system on a south roof pitch of a single family detached dwelling.Boulder$8,000
Dec 10, 2014Electrical PermitInstallation of a flush mount, grid-tied, 6.9kW photovoltaic system. Array to remain below ridge, inside/below hips and rake edges, and above eave. See engineerBoulder$20,000
Sep 5, 2013Electrical PermitInstallation of a flush mount grid-tied 3.75 kW photovoltaic system. Array to remain below ridge, inside/below hips and rake edges, and above eave. See engineerBoulder$13,000
Jun 21, 2012Electrical PermitInstallation of a flush mount grid-tie 3.0 kW photovoltaic system on this multifamily structure. Other units to have photovoltaic arrays installed by separate pBoulder$10,000
Jun 21, 2012Electrical PermitInstallation of a flush mount grid-tie 3.0 kW photovoltaic system on this multifamily structure. Other units to have photovoltaic arrays installed by separate pBoulder$10,000
Jun 21, 2012Electrical PermitInstallation of a flush mount grid-tie 3.0 kW photovoltaic system on this multifamily structure. Other units to have photovoltaic arrays installed by separate pBoulder$10,000
Jan 19, 2012Electrical PermitUnit D -- Installation of a 2 kW photovoltaic system. See engineering documentation for supplemental information.Boulder$6,500

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.