Contractor · Electrical
ENDURANCE SOLAR & ENGINEERIN
11 building permits since 2010 in Boulder city, CO — $161,000 in reported job value over 11 permits that state one.
- Building permits
- 11
- Reported job value
- $161K
- Active
- 2010–2015
- Latest permit
- Feb 18, 2015
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Boulder city, CO11
Permits by year
By issue date (application date where there is none).
024
4
201020112012201320142015
View as tableHide table
| Year | Permits |
|---|---|
| 2010 | 2 |
| 2011 | 1 |
| 2012 | 4 |
| 2013 | 1 |
| 2014 | 1 |
| 2015 | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar11
- Electrical11
- Roofing3
Permit types
As the building departments classify them.
- Electrical Permit11
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Feb 18, 2015 | Electrical Permit | Installation of 6.867 kW flush mount PV system on south roof pitch of a single family detached dwelling. | Boulder | $24,500 |
| Feb 18, 2015 | Electrical Permit | Installation of a 2.0 kW flush mount PV system on a south roof pitch of a single family detached dwelling. | Boulder | $8,000 |
| Dec 10, 2014 | Electrical Permit | Installation of a flush mount, grid-tied, 6.9kW photovoltaic system. Array to remain below ridge, inside/below hips and rake edges, and above eave. See engineer | Boulder | $20,000 |
| Sep 5, 2013 | Electrical Permit | Installation of a flush mount grid-tied 3.75 kW photovoltaic system. Array to remain below ridge, inside/below hips and rake edges, and above eave. See engineer | Boulder | $13,000 |
| Jun 21, 2012 | Electrical Permit | Installation of a flush mount grid-tie 3.0 kW photovoltaic system on this multifamily structure. Other units to have photovoltaic arrays installed by separate p | Boulder | $10,000 |
| Jun 21, 2012 | Electrical Permit | Installation of a flush mount grid-tie 3.0 kW photovoltaic system on this multifamily structure. Other units to have photovoltaic arrays installed by separate p | Boulder | $10,000 |
| Jun 21, 2012 | Electrical Permit | Installation of a flush mount grid-tie 3.0 kW photovoltaic system on this multifamily structure. Other units to have photovoltaic arrays installed by separate p | Boulder | $10,000 |
| Jan 19, 2012 | Electrical Permit | Unit D -- Installation of a 2 kW photovoltaic system. See engineering documentation for supplemental information. | Boulder | $6,500 |
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.