Contractor · Electrical

DESJARDIN MICHAEL ANTHONY

11 building permits since 2019 in Santa Cruz County, CA.

Building permits
11
Reported job value
—
Active
2019–2026
Latest permit
Oct 9, 2026

Where it works

Counties shaded by permits filed there.

Permits by county, fewer to more

Busiest jurisdictions

  • Santa Cruz County, CA11

Permits by year

By issue date (application date where there is none).

024
4
2019202120242026*
* 2026 is year to date.
View as table
YearPermits
20191
20212
20244
2026 (YTD)4

Type of work

Permits describing each kind of work; one permit can cover several.

  • Battery storage4
  • HVAC2
  • Bathrooms2
  • Plumbing2
  • Electrical2
  • Gas1
  • Kitchens1
  • Remodels1
  • Additions1
  • Heat pumps1

Permit types

As the building departments classify them.

  • Building11

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 9, 2026BuildingConstruction Change Document #1 to Permit B-243383 (from APP-241038) to include the following: Revision to driveway turnaround.Santa Cruz County—
Apr 14, 2026BuildingDISC 251329 Construct a (N) 1,024 SF metal building for agricultural use with a bathroom and recognize unpermitted 897 SF garage with a 360 SF attached carport.Santa Cruz County—
Apr 14, 2026BuildingDISC251329 Construct a (N) 1,024 SF metal building for agricultural use with a bathroom. Permit to include (N) looped driveway and concrete pads with utilities,Santa Cruz County—
Apr 14, 2026BuildingDISC251329 Recognize unpermitted 897 SF garage with a 360 SF attached carport onsite with an existing SFD. Verify and/or install listed smoke and carbon monoxidSanta Cruz County—
Aug 2, 2024BuildingGo on line and check the status of your application, correction and approval letters will not be mailed. Install a (13.5)kWh, (1) battery energy storage system Santa Cruz County—
May 8, 2024BuildingInstallation of a new level 2 EV charging station at an existing SFD.Santa Cruz County—
Apr 8, 2024BuildingGo on line and check the status of your application, correction and approval letters will not be mailed. Install a (13.5 )kWh, (1 ) Tesla Powerwall battery enerSanta Cruz County—
Mar 25, 2024BuildingInstall new/replacement gas Force Air Unit with associated duct work and piping and venting, permit to include addition of a 5 ton heat pump in side yard add a Santa Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed10
  • Not stated1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.