Contractor · Electrical
DESJARDIN MICHAEL ANTHONY
11 building permits since 2019 in Santa Cruz County, CA.
- Building permits
- 11
- Reported job value
- —
- Active
- 2019–2026
- Latest permit
- Oct 9, 2026
Where it works
Counties shaded by permits filed there.
Busiest jurisdictions
- Santa Cruz County, CA11
Permits by year
By issue date (application date where there is none).
024
4
2019202120242026*
View as tableHide table
| Year | Permits |
|---|---|
| 2019 | 1 |
| 2021 | 2 |
| 2024 | 4 |
| 2026 (YTD) | 4 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Battery storage4
- HVAC2
- Bathrooms2
- Plumbing2
- Electrical2
- Gas1
- Kitchens1
- Remodels1
- Additions1
- Heat pumps1
Permit types
As the building departments classify them.
- Building11
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 9, 2026 | Building | Construction Change Document #1 to Permit B-243383 (from APP-241038) to include the following: Revision to driveway turnaround. | Santa Cruz County | — |
| Apr 14, 2026 | Building | DISC 251329 Construct a (N) 1,024 SF metal building for agricultural use with a bathroom and recognize unpermitted 897 SF garage with a 360 SF attached carport. | Santa Cruz County | — |
| Apr 14, 2026 | Building | DISC251329 Construct a (N) 1,024 SF metal building for agricultural use with a bathroom. Permit to include (N) looped driveway and concrete pads with utilities, | Santa Cruz County | — |
| Apr 14, 2026 | Building | DISC251329 Recognize unpermitted 897 SF garage with a 360 SF attached carport onsite with an existing SFD. Verify and/or install listed smoke and carbon monoxid | Santa Cruz County | — |
| Aug 2, 2024 | Building | Go on line and check the status of your application, correction and approval letters will not be mailed. Install a (13.5)kWh, (1) battery energy storage system | Santa Cruz County | — |
| May 8, 2024 | Building | Installation of a new level 2 EV charging station at an existing SFD. | Santa Cruz County | — |
| Apr 8, 2024 | Building | Go on line and check the status of your application, correction and approval letters will not be mailed. Install a (13.5 )kWh, (1 ) Tesla Powerwall battery ener | Santa Cruz County | — |
| Mar 25, 2024 | Building | Install new/replacement gas Force Air Unit with associated duct work and piping and venting, permit to include addition of a 5 ton heat pump in side yard add a | Santa Cruz County | — |
Permit status
Where its permits stand, as the departments report them.
- Completed10
- Not stated1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.