Contractor · General building

DAPC LLC

11 building permits since 2015 in Santa Cruz County, CA.

Building permits
11
Reported job value
—
Active
2015–2024
Latest permit
Feb 14, 2024

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Santa Cruz County, CA11

Permits by year

By issue date (application date where there is none).

012
2
2015201820222024
View as table
YearPermits
20152
20161
20182
20212
20222
20231
20241

Type of work

Permits describing each kind of work; one permit can cover several.

  • Remodels7
  • Plumbing7
  • Roofing6
  • Electrical6
  • Windows & doors6
  • HVAC5
  • Bathrooms5
  • Kitchens4
  • Water heaters3
  • Gas2

Permit types

As the building departments classify them.

  • Building11

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Feb 14, 2024BuildingTear off roofing at an existing SFD and install new sheathing if required and class A or better (comp) roofing. This permit replaces B-154210 (reroof). Install Santa Cruz County—
Dec 20, 2023BuildingInterior and Exterior remodel of an existing 2,562sf SFD to include the following: New cabinets, appliances, flooring, countertops, tile, replace/upgrade electrSanta Cruz County—
Jul 25, 2022BuildingInstall a branch circuit to the edge of a new deck along 41st Ave. Receptacles must be GFCI protected, wet rated with an in-use weather proof cover. Install or Santa Cruz County—
Jan 19, 2022BuildingAn interior and exterior remodel to an existing single story 2 bedroom SFD, scope of work to include, re-building of (E) rooms and modifications to some openingSanta Cruz County—
Sep 29, 2021BuildingInterior remodel to include the kitchen and 3-1/2 bathrooms, scope of work to include new cabinets, appliances, countertops, tile, fixtures, upgrade electrical,Santa Cruz County—
Feb 24, 2021BuildingLRA, CENTRAL FPD Permit for interior & exterior remodel, reroof, and water heater, including but not limited to: electrical service upgrade, electrical circuitsSanta Cruz County—
Aug 2, 2018BuildingTear off roofing at an existing SFD and install new sheathing if required and class B or better (comp) roofing. Install listed smoke detectors and carbon monoxiSanta Cruz County—
May 30, 2018BuildingLRA Interior kitchen and (2) bath remodel to include new cabinets, appliances, flooring, countertops, tile and replace/upgrade electrical/plumbing/mechanical fiSanta Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed8
  • Active3

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.