Contractor · Electrical

CROSS PRICE ELECTRIC

11 building permits since 2017 in Riverside city, CA; Redlands city, CA and Los Angeles city, CA, across 3 counties — $9,818 in reported job value over 6 permits that state one.

Building permits
11
Reported job value
$9.8K
Active
2017–2026
Latest permit
Jul 13, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Riverside city, CA6
  • Redlands city, CA4
  • Los Angeles city, CA1

Permits by year

By issue date (application date where there is none).

024
4
20172018201920212026*
* 2026 is year to date.
View as table
YearPermits
20174
20184
20191
20211
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical11
  • EV chargers9
  • Electric meters1

Permit types

As the building departments classify them.

  • BRES5
  • B-BEP Electrical Permit4
  • Electrical1
  • Residential1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jul 13, 2026Residential200 AMP SINGLE METER PANEL UPGRADE WITH RELOCATION.Riverside City$2,000
Mar 10, 2021ElectricalPLAN CHECK FOR POWER ONLY, SCOPE OF WORK INCLUDES NEW 1600 AMP, 480/27Los Angeles City—
Jul 3, 2019BRES(1) 60 AMP CIRCUIT FOR A LEVEL 2 ELECTRIC VEHICLE CHARGER IN GARAGE, ADDING 50 AMP SUB PANEL ***EXISTING SERVICE PANEL 200 AMP***Riverside City$750
Oct 2, 2018BRES(1) 100 AMP CIRCUIT FOR A LEVEL 2 ELECTRIC VEHICLE CHARGER IN GARAGE *EXISTING SERVICE PANEL 125 AMP**Riverside City$800
Aug 22, 2018BRESINSTALL 240 VOLT 50AMP OUTLET IN GARAGE (FOR TESLA CHARGER) ***EXISTING 200AMP MAIN ELECTRICAL PANEL****Riverside City$4,400
Jun 8, 2018BRESTESLA WALL CHARGER 100 AMP SUBPANEL/90 AMP BREAKER REVISED SCOPE OF WORK TO: 90 AMP BREAKER FOR TESLA WALL CONNECTOR 06/21/18Riverside City$1,008
Mar 30, 2018B-BEP Electrical PermitRESIDENCE - INSTALL ELECTRIC VEHICLE CHARGERRedlands City—
Jul 7, 2017B-BEP Electrical PermitRESIDENCE - INSTALL NEW 32AMP ELECTRIC VEHICLE CHARGER IN STORAGE ROOMRedlands City—

Permit status

Where its permits stand, as the departments report them.

  • Finaled7
  • Issued1
  • Expired1
  • Not stated1
  • Completed1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.