Contractor · General building

CORWIN MARK A & TERESA

11 building permits since 2017 in Santa Cruz County, CA.

Building permits
11
Reported job value
—
Active
2017–2025
Latest permit
May 27, 2025

Where it works

Counties shaded by permits filed there.

Permits by county, fewer to more

Busiest jurisdictions

  • Santa Cruz County, CA11

Permits by year

By issue date (application date where there is none).

024
4
201720182021202220242025
View as table
YearPermits
20171
20182
20214
20222
20241
20251

Type of work

Permits describing each kind of work; one permit can cover several.

  • Accessory dwelling units5
  • Demolition3
  • Electrical3
  • Gas2
  • Remodels2
  • Bathrooms2
  • HVAC1
  • Solar1
  • Roofing1
  • Plumbing1

Permit types

As the building departments classify them.

  • Building11

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
May 27, 2025BuildingConstruction Change Document #1 to Permit B-243802 to include the following; Exterior staircase reconfigured to include 7'9" X 3'1" catwalk and straight run staSanta Cruz County—
Aug 6, 2024BuildingPermit to address Service Request 18669 Demolition of existing exterior stair and construct a (N) stair and landing to the existing rooftop deck of the ADU. InsSanta Cruz County—
Jul 19, 2022BuildingConstruction Change Document #1 to permit B-212668 to switch from electric heat pump water heater to tankless gas water heater, switch from electric fireplace tSanta Cruz County—
May 11, 2022BuildingTear off roofing at an existing SFD and install new sheathing if required and class-B or better roofing. Install listed smoke detectors and carbon monoxide alarSanta Cruz County—
Dec 20, 2021BuildingDemolish an existing 780 sq. ft. 1-story dwelling unit and replace with a new 757 sq. ft. 1-story, 1-bedroom, 1-bath ADU, on site with an existing SFD. Install Santa Cruz County—
Sep 23, 2021BuildingSI completed and Replacement ADU application in process. Demo permit to remove detached ADU - not suitable to be moved. Batch ran @ 9/28/2022 8:15:55 PMSanta Cruz County—
Sep 8, 2021BuildingSpecial Inspection to determine if (E) ADU can be moved from the rear of the property and meets code requirements to be relocated.Santa Cruz County—
Apr 14, 2021BuildingGo on line and check the status of your application, correction and approval letters will not be mailed. Install a roof mount(8.88)kW, (24) modules photovoltaicSanta Cruz County—

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.