11 building permits since 2017 in Santa Cruz County, CA.

Building permits
11
Reported job value
—
Active
2017–2025
Latest permit
Dec 17, 2025

Where it works

Counties shaded by permits filed there.

Permits by county, fewer to more

Busiest jurisdictions

  • Santa Cruz County, CA11

Permits by year

By issue date (application date where there is none).

01.53
3
201720192022202320242025
View as table
YearPermits
20171
20193
20222
20231
20242
20252

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar4
  • Accessory dwelling units3
  • Bathrooms3
  • Electrical3
  • Battery storage2
  • Roofing2
  • Windows & doors2
  • Remodels1
  • Plumbing1
  • Water heaters1

Permit types

As the building departments classify them.

  • Building11

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Dec 17, 2025BuildingConstruction Change Document #1 to DEF PV Permit B-255197 to include following: Removing ESS unit from scope work and switching TESLA MCI-2 to new (10)ENPHASE ISanta Cruz County—
Sep 24, 2025BuildingDeferred Submittal # 1 to building permit B-233865 to include following: Install a roof mount (4.5)kW, (10) modules photovoltaic electrical system not to exceedSanta Cruz County—
Jun 13, 2024BuildingConstruct a (N) 1,000 SF 2-story, 2-bedroom, 1.5-bath ADU with a 100 SF covered porch. DEFERRED SUBMITTAL: PV SYSTEMSanta Cruz County—
Jun 13, 2024BuildingThis application was created as a result of Master Application APP-231039. construct approx. 504 sq. ft. of on-site retaining walls.Santa Cruz County—
Jun 6, 2023BuildingConstruct a new 1,000 sq. ft. 2-story, 2 bedroom, 1-1/2 bath ADU with a 100 sq. ft. covered porch and construct approx. 504 sq. ft. of on-site retaining walls. Santa Cruz County—
Dec 27, 2022BuildingGo on line and check the status of your application, correction and approval letters will not be mailed. Install a (10)kWh, (1) battery energy storage system onSanta Cruz County—
Oct 24, 2022BuildingGo on line and check the status of your application, correction and approval letters will not be mailed. Install a roof mount(8.16)kW, (24) modules photovoltaicSanta Cruz County—
Sep 30, 2019BuildingBen Lomond Fire-SRA Mod Tear off lower section of roofing at an existing SFD and install new sheathing if required and class B or better (comp) roofing to incluSanta Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed10
  • Active1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.