COLLACINO ROBERT P & RENEE L
11 building permits since 2017 in Santa Cruz County, CA.
- Building permits
- 11
- Reported job value
- —
- Active
- 2017–2025
- Latest permit
- Dec 17, 2025
Where it works
Counties shaded by permits filed there.
Busiest jurisdictions
- Santa Cruz County, CA11
Permits by year
By issue date (application date where there is none).
01.53
3
201720192022202320242025
View as tableHide table
| Year | Permits |
|---|---|
| 2017 | 1 |
| 2019 | 3 |
| 2022 | 2 |
| 2023 | 1 |
| 2024 | 2 |
| 2025 | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar4
- Accessory dwelling units3
- Bathrooms3
- Electrical3
- Battery storage2
- Roofing2
- Windows & doors2
- Remodels1
- Plumbing1
- Water heaters1
Permit types
As the building departments classify them.
- Building11
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Dec 17, 2025 | Building | Construction Change Document #1 to DEF PV Permit B-255197 to include following: Removing ESS unit from scope work and switching TESLA MCI-2 to new (10)ENPHASE I | Santa Cruz County | — |
| Sep 24, 2025 | Building | Deferred Submittal # 1 to building permit B-233865 to include following: Install a roof mount (4.5)kW, (10) modules photovoltaic electrical system not to exceed | Santa Cruz County | — |
| Jun 13, 2024 | Building | Construct a (N) 1,000 SF 2-story, 2-bedroom, 1.5-bath ADU with a 100 SF covered porch. DEFERRED SUBMITTAL: PV SYSTEM | Santa Cruz County | — |
| Jun 13, 2024 | Building | This application was created as a result of Master Application APP-231039. construct approx. 504 sq. ft. of on-site retaining walls. | Santa Cruz County | — |
| Jun 6, 2023 | Building | Construct a new 1,000 sq. ft. 2-story, 2 bedroom, 1-1/2 bath ADU with a 100 sq. ft. covered porch and construct approx. 504 sq. ft. of on-site retaining walls. | Santa Cruz County | — |
| Dec 27, 2022 | Building | Go on line and check the status of your application, correction and approval letters will not be mailed. Install a (10)kWh, (1) battery energy storage system on | Santa Cruz County | — |
| Oct 24, 2022 | Building | Go on line and check the status of your application, correction and approval letters will not be mailed. Install a roof mount(8.16)kW, (24) modules photovoltaic | Santa Cruz County | — |
| Sep 30, 2019 | Building | Ben Lomond Fire-SRA Mod Tear off lower section of roofing at an existing SFD and install new sheathing if required and class B or better (comp) roofing to inclu | Santa Cruz County | — |
Permit status
Where its permits stand, as the departments report them.
- Completed10
- Active1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.