Contractor · General building

Bryant Hannah

11 building permits since 2019 in Orleans Parish, LA.

Building permits
11
Reported job value
—
Active
2019–2020
Latest permit
Apr 30, 2020

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Orleans Parish, LA11

Permits by year

By issue date (application date where there is none).

048
8
20192020
View as table
YearPermits
20198
20203

Type of work

Permits describing each kind of work; one permit can cover several.

  • Remodels10
  • Telecom8
  • Additions1
  • Generators1

Permit types

As the building departments classify them.

  • Renovation (Non-Structural)10

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Apr 30, 2020Renovation (Non-Structural)ATC 371661 - VZW UpgradeOrleans Parish—
Apr 30, 2020Renovation (Non-Structural)THE PROPOSED PROJECT INCLUDES MODIFYING GROUND BASED AND TOWER MOUNTED EQUIPMENT AS INDICATED PER BELOW: REMOVE (4) RRH(s) INSTALL (4) RRH(s) EXISTING (6) ANTENOrleans Parish—
Mar 6, 2020Renovation (Non-Structural)Removing 6 antennas, 3 TMA's, 1 coaxial cable; Adding 6 antennas, 1 OVP on the ground, 1 OVP on the tower, 1 Hybrid cable, 3 RRU's on the tower.Orleans Parish—
Nov 13, 2019Renovation (Non-Structural)Verizon Wireless to upgrade equipment on existing cell tower site.Orleans Parish—
Nov 11, 2019Renovation (Non-Structural)THE PROPOSED PROJECT INCLUDES MODIFYING GROUND BASED AND TOWER MOUNTED EQUIPMENT AS INDICATED PER BELOW: REMOVE (2) PANELS, (12) RRUs, (4) COMBINERS, (1) OVP, (Orleans Parish—
Nov 11, 2019Renovation (Non-Structural)THE PROPOSED PROJECT INCLUDES MODIFYING GROUND BASED AND TOWER MOUNTED EQUIPMENT AS INDICATED PER BELOW: TOWER WORK: REMOVE (6) PANELS AND (6) RRUS INSTALL (6) Orleans Parish—
Aug 8, 2019Renovation (Non-Structural)304873 - T-Mobile upgrade to existing cell tower site. Adding additional antenna and radio equipment.Orleans Parish—
Aug 6, 2019Renovation (Non-Structural)Verizon to upgrade equipment at existing cell tower site.Orleans Parish—

Permit status

Where its permits stand, as the departments report them.

  • Closed10
  • Issued1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.