Contractor · General building
BENJAMIN AUGSBURGER & APRIL CRAWFORD
11 building permits since 2021 in Berwyn city, IL — $68,991 in reported job value over 7 permits that state one.
- Building permits
- 11
- Reported job value
- $69K
- Active
- 2021–2026
- Latest permit
- Jun 11, 2026
Where it works
Counties shaded by permits filed there.
Busiest jurisdictions
- Berwyn city, IL11
Permits by year
By issue date (application date where there is none).
024
4
2021202220232026*
View as tableHide table
| Year | Permits |
|---|---|
| 2021 | 2 |
| 2022 | 4 |
| 2023 | 4 |
| 2026 (YTD) | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Remodels7
- Plumbing5
- Electrical5
- New construction3
- HVAC2
- Kitchens2
- Roofing1
- Windows & doors1
- Water heaters1
- Electric meters1
Permit types
As the building departments classify them.
- OTHER - REMODELING7
- OTHER - MINOR NEW CONSTRUCTION3
- FIREPLACE-CENTRAL AIR CONDITIONING1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jun 11, 2026 | OTHER - REMODELING | TEAR OFF AND REROOF THE HOUSE AND GARAGE TO CODE - MUST INSTALL BASE SHEET BEFORE MOD BIT IS INSTALLED - R/R GUTTERS ON THE HOUSE AND GARAGE TO CODE. | Berwyn (Cook County) | $26,557 |
| May 30, 2023 | OTHER - REMODELING | PLUMBING FINAL REINSPECTION - REMOVING AND REPLACING OLD KITCHEN CABINETS AND COUNTERTOPS. REPAIRING HARDWOOD FLOORING. REPLACING THE BOTTOM 3-4FT OF DRYWALL IN | Berwyn (Cook County) | — |
| May 26, 2023 | OTHER - MINOR NEW CONSTRUCTION | INSTALL 1 WATER SERVICE TO CODE. PARKWAY MUST BE RE-SODDED. CALL WATER DEPARTMENT FOR WATER METER UPGRADE - 788-2660 EXT 6463. | Berwyn (Cook County) | $13,200 |
| Feb 24, 2023 | OTHER - REMODELING | PAYING FOR ADDITIONAL ELECTRICAL INSPECTIONS. | Berwyn (Cook County) | — |
| Feb 2, 2023 | OTHER - REMODELING | REMOVING AND REPLACING OLD KITCHEN CABINETS AND COUNTERTOPS. REPAIRING HARDWOOD FLOORING. REPLACING THE BOTTOM 3-4FT OF DRYWALL IN THE KITCHEN DUE TO FLOOD DAMA | Berwyn (Cook County) | $10,450 |
| Sep 21, 2022 | FIREPLACE-CENTRAL AIR CONDITIONING | R/R AC 3 TON A/C CONDENSERS MUST BE LOCATED BEHIND THE HOUSE 3 FROM PROPERTY LOT LINE AND ELECTRICAL METER. | Berwyn (Cook County) | $5,589 |
| Aug 23, 2022 | OTHER - MINOR NEW CONSTRUCTION | PAYING FOR PLUMBING ROUGH RE-INSPECTION FEE ---- INSTALLING NEW FLOOD CONTROL SYSTEM IN FRONT YARD- PRIVATE PROPERTY. ELECTRICAL ALREADY EXISTS. BACK WATER VALV | Berwyn (Cook County) | — |
| Aug 16, 2022 | OTHER - MINOR NEW CONSTRUCTION | PAYING FOR REIMSPETION ON PLUMBING UNDERGROUNG, BEDDING,HEAD TEST , ROUGH INSTALLATION ----INSTALLING NEW FLOOD CONTROL SYSTEM IN FRONT YARD- PRIVATE PROPERTY. | Berwyn (Cook County) | — |
Permit status
Where its permits stand, as the departments report them.
- Closed10
- Pending1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.