Contractor · Electrical
BAGLINO ANDREW DAVID
11 building permits since 2021 in Santa Cruz County, CA.
- Building permits
- 11
- Reported job value
- —
- Active
- 2021–2024
- Latest permit
- Dec 9, 2024
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Santa Cruz County, CA11
Permits by year
By issue date (application date where there is none).
024
4
202120222024
View as tableHide table
| Year | Permits |
|---|---|
| 2021 | 4 |
| 2022 | 3 |
| 2024 | 4 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Battery storage3
- Roofing3
- Accessory dwelling units2
- Solar2
- Electrical2
- Remodels1
- EV chargers1
Permit types
As the building departments classify them.
- Building11
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Dec 9, 2024 | Building | Go online and check the status of your application, correction and approval letters will not be mailed. Install a (40.5)kWh, (3) battery energy storage system o | Santa Cruz County | — |
| Aug 14, 2024 | Building | Extension to permit B-221577 to extend until 2/13/2025 | Santa Cruz County | — |
| Aug 14, 2024 | Building | Extension to permit B-211986 to extend until 2/13/2025 | Santa Cruz County | — |
| Aug 14, 2024 | Building | Extension to permit B-211985 to extend until 2/13/2025 | Santa Cruz County | — |
| Apr 7, 2022 | Building | Construction change document #1 to B-216695 to include, plans to match as built - EV chargers added to the plans. New scope to show 9.144kw Solar Roof system wi | Santa Cruz County | — |
| Feb 3, 2022 | Building | Central FPD/LRA Replace existing 200 AMP electric service panel with new 225AMP service panel at an existing SFD. Install listed smoke detectors and carbon mono | Santa Cruz County | — |
| Jan 20, 2022 | Building | Construction change document #1 to B-211985, to include change roof framing from stick frame to pre-manufactured trusses. | Santa Cruz County | — |
| Dec 29, 2021 | Building | Go on line and check the status of your application, correction and approval letters will not be mailed. Install a solar roofing system (9.14)kW, and a (27)kWh, | Santa Cruz County | — |
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.