Contractor · Electrical

Armando Soltra

11 building permits since 2025 in Lakewood city, CA.

Building permits
11
Reported job value
—
Active
2025–2026
Latest permit
Oct 22, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Lakewood city, CA11

Permits by year

By issue date (application date where there is none).

0510
10
20252026*
* 2026 is year to date.
View as table
YearPermits
202510
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical11

Permit types

As the building departments classify them.

  • Electrical Permit 202611

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 22, 2026Electrical Permit 20266 new light poles 1:1 replacement *NO FEE PERMIT. FOR PW # 2024-12Lakewood City—
Nov 3, 2025Electrical Permit 2026Lighting Retrofit 1 for 1 fixture replacement with new LED fixture, No modification to existing Circuits.Lakewood City—
Nov 3, 2025Electrical Permit 2026Lighting Retrofit: 1:1 Fixture Replacement with New LED Fixture. No modifications to existing circuits, no increased load, and no new load.Lakewood City—
Nov 3, 2025Electrical Permit 2026Lighting Retrofit: 1:1 Fixture Replacement with New LED Fixture. No modifications to existing circuits, no increased load, and no new load.Lakewood City—
Nov 3, 2025Electrical Permit 2026Lighting Retrofit: 1:1 Fixture Replacement with New LED Fixture. No modifications to existing circuits, no increased load, and no new load.Lakewood City—
Nov 3, 2025Electrical Permit 2026Lighting Retrofit: 1:1 Fixture Replacement with New LED Fixture. No modifications to existing circuits, no increased load, and no new load.Lakewood City—
Nov 3, 2025Electrical Permit 2026Lighting Retrofit: 1:1 Fixture Replacement with New LED Fixture. No modifications to existing circuits, no increased load, and no new load.Lakewood City—
Nov 3, 2025Electrical Permit 2026Lighting Retrofit: 1:1 Fixture Replacement with New LED Fixture. No modifications to existing circuits, no increased load, and no new load.Lakewood City—

Permit status

Where its permits stand, as the departments report them.

  • Completed6
  • Active5

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.