Contractor · Electrical
PREMIER POWER, LLC
182 building permits since 2018 in St. Louis city, MO; St. Louis County, MO and Wildwood city, MO, across 2 counties — $2,326,527 in reported job value over 182 permits that state one.
- Building permits
- 182
- Reported job value
- $2.3M
- Active
- 2018–2026
- Latest permit
- Nov 4, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- St. Louis city, MO92
- St. Louis County, MO55
- Wildwood city, MO10
- Chesterfield city, MO6
- Hazelwood city, MO3
- Ladue city, MO3
- Manchester city, MO3
- Ellisville city, MO2
- Black Jack city, MO1
- Clayton city, MO1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2018 | 13 |
| 2019 | 35 |
| 2020 | 83 |
| 2021 | 4 |
| 2022 | 3 |
| 2023 | 1 |
| 2024 | 5 |
| 2025 | 12 |
| 2026 (YTD) | 26 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical160
- Remodels49
- Kitchens37
- Bathrooms17
- Electric meters12
- Generators6
- HVAC5
- Plumbing5
- Pools & hot tubs5
- Roofing3
Permit types
As the building departments classify them.
- ELECTRICAL92
- ELECTRICAL RESIDENTIAL ELECTRICAL51
- ELECTRICAL COMMERCIAL ELECTRICAL12
- BUILDING RESIDENTIAL EXISTING BUILDING6
- BUILDING RESIDENTIAL NON-HABITABLE6
- ELECTRICAL MULTIFAMILY ELECTRICAL5
- BUILDING COMMERCIAL NON-HABITABLE4
- BUILDING RESIDENTIAL EXISTING BUILDING (INTEGRATED/NON-INTEGRATED)3
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Nov 4, 2026 | ELECTRICAL RESIDENTIAL ELECTRICAL | Wire for 50 amp portableback up generator, inlet port and install Panel cover lockout and 50 amp breaker to Feed a subpanel. Move circuits from existing panel i | St. Louis County | $8,500 |
| Nov 4, 2026 | ELECTRICAL RESIDENTIAL ELECTRICAL | Install 50 amp portable back up generator inlet wired to 50 amp breaker in main panel and install lockout device on main panel. Feed new subpanel with 50 amp br | St. Louis County | $8,500 |
| Oct 29, 2026 | ELECTRICAL COMMERCIAL ELECTRICAL | ENGLISH ACRESAdd lighting over riding areas in open areas of main arena on existing circuits. NO BUILDING SCOPE | St. Louis County | $18,000 |
| Oct 29, 2026 | ELECTRICAL COMMERCIAL ELECTRICAL | ENGLISH ACRESAdd lighting over riding areas in open areas of main arena on existing circuits. NO BUILDING SCOPE | Valley Park City | $18,000 |
| Oct 29, 2026 | ELECTRICAL RESIDENTIAL ELECTRICAL | Add new separate 20 amp circuit for GFI outlet in first floor bathroom. Also, move breakfast room, light fixture 6 inches.No building scope | St. Louis County | $800 |
| Oct 26, 2026 | ELECTRICAL RESIDENTIAL ELECTRICAL | Upgrade 100 amp service to 200 amp overhead service mast type. Relocate meter around the corner to the right side of the building. Add GFCI receptacle below sub | St. Louis County | $3,800 |
| Oct 26, 2026 | ELECTRICAL RESIDENTIAL ELECTRICAL | Upgrade 100 amp service to 200 amp overhead service mast type. Relocate meter around the corner to the right side of the building. Add GFCI receptacle below sub | Hazelwood City | $3,800 |
| Oct 22, 2026 | ELECTRICAL RESIDENTIAL ELECTRICAL | Have AMEREN pull service feeders back from meter socketand drill holes in sweep 90° elbow and above slip joint to comply with AMEREN requirements330320201 premi | Manchester City | $500 |
Permit status
Where its permits stand, as the departments report them.
- Issued109
- Completed53
- Void14
- Cancelled3
- Pending2
- Active1
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.