Contractor · Specialty (solar, fire, telecom)

Altamirano

11 building permits since 2022 in Los Angeles city, CA.

Building permits
11
Reported job value
—
Active
2022–2023
Latest permit
Apr 7, 2023

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA11

Permits by year

By issue date (application date where there is none).

036
6
20222023
View as table
YearPermits
20226
20235

Type of work

Permits describing each kind of work; one permit can cover several.

  • Fire sprinklers11
  • Remodels4
  • Plumbing2
  • Additions1

Permit types

As the building departments classify them.

  • Fire Sprinkler11

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Apr 7, 2023Fire SprinklerINSTALLATION OF NFPA 13D SYSTEM. 1" DOMESTIC METER, NO BACKFLOW.Los Angeles City—
Apr 7, 2023Fire SprinklerFIRE SPRINKLER T.I. INCLUDES HIGH PILED STORAGE. (E) FIRE PUMP WITH (ELos Angeles City—
Mar 2, 2023Fire SprinklerNEW NFPA 13D SPRINKLER SYSTEM. 1-INCH DOMESTIC WATER METER.Los Angeles City—
Mar 1, 2023Fire SprinklerT.I Fire sprinkler add, relocate and plug sprinkler heads. SCOPE OF WLos Angeles City—
Feb 28, 2023Fire SprinklerInstall fire sprinkler system per NFPA-13R. (E) 2" domestic usage meteLos Angeles City—
Dec 14, 2022Fire SprinklerTENANT IMPROVEMENT. ADDITION OF 15 FIRE SPRINKLER HEADS.Los Angeles City—
Aug 19, 2022Fire SprinklerNFPA 13 SPRINKLER T.I. - 6 ADDITIONAL HEADSLos Angeles City—
Jun 28, 2022Fire SprinklerINSTALLATION OF NFPA 13D SYSTEM. 1" DOMESTIC METER, NO BACKFLOWLos Angeles City—

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.