Contractor · General building
ALCHRIS LLC
11 building permits since 2017 in Ossining village, NY — $50,595 in reported job value over 8 permits that state one.
- Building permits
- 11
- Reported job value
- $50.6K
- Active
- 2017–2020
- Latest permit
- Oct 27, 2020
Where it works
Counties shaded by permits filed there.
Busiest jurisdictions
- Ossining village, NY11
Permits by year
By issue date (application date where there is none).
02.55
5
2017201820192020
View as tableHide table
| Year | Permits |
|---|---|
| 2017 | 1 |
| 2018 | 2 |
| 2019 | 3 |
| 2020 | 5 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Bathrooms7
- Remodels3
- Plumbing3
- Electrical3
- HVAC2
- Kitchens2
- Gas1
- Additions1
- Windows & doors1
- Water heaters1
Permit types
As the building departments classify them.
- V-ELECTRICAL3
- V-PLUMBING3
- V-RENOVATIONS/ALTERATIONS2
- V-TANK REMOVAL / INSTALL2
- V-MECHANICAL HVAC SYSTEMS1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 27, 2020 | V-TANK REMOVAL / INSTALL | Removal of 550-gal U.S.T. from right side of house and install of 330-gal A.S.T. in basement. | Ossining Village | $2,095 |
| Sep 15, 2020 | V-ELECTRICAL | Wiring for interior alterations. 1st Fl new master bath, new half bath at foyer/entry. New hydronic baseboard heater in sunroom, wire central AC unit in attic. | Ossining Village | $5,000 |
| Sep 8, 2020 | V-MECHANICAL HVAC SYSTEMS | Installation of Central Air system. | Ossining Village | $7,000 |
| Jul 28, 2020 | V-PLUMBING | 1st Floor. Rough in new master bathroom: 1 shower, 1 sink, 1 toilet. Rough in new half bath: 1 toilet, 1 sink. Rough in new laundry: 1 washing machine. 6 total | Ossining Village | — |
| Jun 9, 2020 | V-RENOVATIONS/ALTERATIONS | Interior alterations. New bath constructed for first floor master bedroom and a new half bath at foyer/entry first floor. | Ossining Village | $22,000 |
| Apr 30, 2019 | V-ELECTRICAL | Amended 7/30/19: Wiring for bedrooms, smoke heads, living room, bedroom, family room, kitchen, dining room. | Ossining Village | $2,500 |
| Apr 29, 2019 | V-PLUMBING | First floor: Roughing in one existing and one new bathroom. 2 water closets, 2 sinks, 1 bathtub, 1 shower. 6 total fixtures. | Ossining Village | — |
| Apr 29, 2019 | V-RENOVATIONS/ALTERATIONS | Add a full hall bathroom on first floor, replace windows at front of the house, and remove one front door and install a new window. | Ossining Village | $10,000 |
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.