Contractor · General building

ALCHRIS LLC

11 building permits since 2017 in Ossining village, NY — $50,595 in reported job value over 8 permits that state one.

Building permits
11
Reported job value
$50.6K
Active
2017–2020
Latest permit
Oct 27, 2020

Where it works

Counties shaded by permits filed there.

Permits by county, fewer to more

Busiest jurisdictions

  • Ossining village, NY11

Permits by year

By issue date (application date where there is none).

02.55
5
2017201820192020
View as table
YearPermits
20171
20182
20193
20205

Type of work

Permits describing each kind of work; one permit can cover several.

  • Bathrooms7
  • Remodels3
  • Plumbing3
  • Electrical3
  • HVAC2
  • Kitchens2
  • Gas1
  • Additions1
  • Windows & doors1
  • Water heaters1

Permit types

As the building departments classify them.

  • V-ELECTRICAL3
  • V-PLUMBING3
  • V-RENOVATIONS/ALTERATIONS2
  • V-TANK REMOVAL / INSTALL2
  • V-MECHANICAL HVAC SYSTEMS1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 27, 2020V-TANK REMOVAL / INSTALLRemoval of 550-gal U.S.T. from right side of house and install of 330-gal A.S.T. in basement.Ossining Village$2,095
Sep 15, 2020V-ELECTRICALWiring for interior alterations. 1st Fl new master bath, new half bath at foyer/entry. New hydronic baseboard heater in sunroom, wire central AC unit in attic. Ossining Village$5,000
Sep 8, 2020V-MECHANICAL HVAC SYSTEMSInstallation of Central Air system.Ossining Village$7,000
Jul 28, 2020V-PLUMBING1st Floor. Rough in new master bathroom: 1 shower, 1 sink, 1 toilet. Rough in new half bath: 1 toilet, 1 sink. Rough in new laundry: 1 washing machine. 6 total Ossining Village—
Jun 9, 2020V-RENOVATIONS/ALTERATIONSInterior alterations. New bath constructed for first floor master bedroom and a new half bath at foyer/entry first floor.Ossining Village$22,000
Apr 30, 2019V-ELECTRICALAmended 7/30/19: Wiring for bedrooms, smoke heads, living room, bedroom, family room, kitchen, dining room.Ossining Village$2,500
Apr 29, 2019V-PLUMBINGFirst floor: Roughing in one existing and one new bathroom. 2 water closets, 2 sinks, 1 bathtub, 1 shower. 6 total fixtures.Ossining Village—
Apr 29, 2019V-RENOVATIONS/ALTERATIONSAdd a full hall bathroom on first floor, replace windows at front of the house, and remove one front door and install a new window.Ossining Village$10,000

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.