Contractor · General building
Alan St. Hilaire
11 building permits since 2025 in Amherst Town city, MA — $176,000 in reported job value over 1 permits that state one.
- Building permits
- 11
- Reported job value
- $176K
- Active
- 2025–2026
- Latest permit
- Oct 29, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Amherst Town city, MA11
Permits by year
By issue date (application date where there is none).
0510
9
20252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2025 | 2 |
| 2026 (YTD) | 9 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Accessory dwelling units11
- Plumbing7
- Remodels1
Permit types
As the building departments classify them.
- Accessory Dwelling Unit (ADU) Construction Permit7
- Single-Family Construction Permit2
- Building Permit - New Accessory Dwelling Unit1
- Repair / Alteration Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 29, 2026 | Accessory Dwelling Unit (ADU) Construction Permit | Connect water and sewer from proposed detatched ADU to existing water and sewer connections on private property per plan provided. | Amherst Town City | — |
| Aug 24, 2026 | Accessory Dwelling Unit (ADU) Construction Permit | Connect water and sewer for detached ADU to existing services as per plan provided | Amherst Town City | — |
| Aug 20, 2026 | Accessory Dwelling Unit (ADU) Construction Permit | Water and sewer connections to existing services for New Detatched Accessory Dwelling Unit | Amherst Town City | — |
| Aug 6, 2026 | Accessory Dwelling Unit (ADU) Construction Permit | Install new 1.25" water service to #27 Newell, then connect water service from house to ADU (after the water meter), tie in to existing 4" sewer lateral for the | Amherst Town City | — |
| Jul 22, 2026 | Accessory Dwelling Unit (ADU) Construction Permit | Install water and sewer connections to | Amherst Town City | — |
| Apr 13, 2026 | Accessory Dwelling Unit (ADU) Construction Permit | Connect to existing laterals for water and sewer for detatched ADU per attached sketch | Amherst Town City | — |
| Apr 6, 2026 | Accessory Dwelling Unit (ADU) Construction Permit | Water and sewer connections to manhole and water main in McClure St for New Detatched Accessory Dwelling Unit located at 346 Lincoln Ave | Amherst Town City | — |
| Mar 10, 2026 | Single-Family Construction Permit | Water and sewer connections to existing service for New Detatched Accessory Dwelling Unit - see BP-26-65. Note we are unable to provide dig safe at this time, a | Amherst Town City | — |
Permit status
Where its permits stand, as the departments report them.
- Completed8
- Active2
- Stop work ordered1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.