Contractor · HVAC
Adriano Amorim
11 building permits since 2018 in Pawtucket city, RI; Barnstable Town city, MA and Falmouth town, MA, across 5 counties — $44,009 in reported job value over 9 permits that state one.
- Building permits
- 11
- Reported job value
- $44K
- Active
- 2018–2025
- Latest permit
- Feb 25, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Pawtucket city, RI4
- Barnstable Town city, MA2
- Falmouth town, MA1
- Acton town, MA1
- Bellingham town, MA1
- Braintree Town city, MA1
- Southborough town, MA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2018 | 2 |
| 2019 | 1 |
| 2022 | 1 |
| 2023 | 5 |
| 2025 | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- HVAC5
- Bathrooms3
- Plumbing3
- Windows & doors2
- Battery storage1
- Electrical1
Permit types
As the building departments classify them.
- Plumbing Permit3
- Building Permit2
- Sheet Metal Permit2
- SHT MTL2
- Electrical Permit1
- Sheetmetal/Mechanical1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Feb 25, 2025 | Plumbing Permit | Replacement of 2 bathrooms sinks, replacement of 1 toilet, new installation of 1 shower stall, installation of 1 Water bubbler, removal of 1 toilet | Acton Town | $9,500 |
| Jan 14, 2025 | Plumbing Permit | Installation of a new full bathroom in the basement | Southborough Town | — |
| Nov 21, 2023 | Building Permit | replacing the door | Pawtucket City | $350 |
| Mar 16, 2023 | SHT MTL | install new zone of duct work on first and second floor | Braintree Town City | $6,000 |
| Feb 9, 2023 | Sheet Metal Permit | Remover ductwork Redo the ductwork Add flexible reconnect line sets Insulation Add another zone ductwork to the basement Supply and return Flexible Zone dampers | Barnstable Town City | $6,309 |
| Jan 24, 2023 | Sheetmetal/Mechanical | add new supply and return at a existing duct to supply master bedroom | Bellingham Town | $1,200 |
| Jan 12, 2023 | Sheet Metal Permit | Installation of 2 furnaces with 2 air handlers and 2 condensers, one on the basement and another one in the attic both with sheet metal works and the unit to be | Barnstable Town City | $20,000 |
| Dec 5, 2022 | SHT MTL | new hvac system 2 air handlers. installation of a new line of duct work | Falmouth Town | — |
Permit status
Where its permits stand, as the departments report them.
- Active4
- Completed4
- Closed2
- Issued1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.