Contractor · Windows, doors & glazing
adam winters
11 building permits since 2024 in Falmouth town, MA.
- Building permits
- 11
- Reported job value
- —
- Active
- 2024–2026
- Latest permit
- Aug 18, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Falmouth town, MA11
Permits by year
By issue date (application date where there is none).
036
6
202420252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2024 | 1 |
| 2025 | 4 |
| 2026 (YTD) | 6 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Roofing4
- Windows & doors4
- Additions3
- Demolition2
- Plumbing1
- Electrical1
Permit types
As the building departments classify them.
- RESI.7
- REP4
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 18, 2026 | REP | removal of existing shingling above and below deck, replacement of trim around sliders. addition of water table trim, and small shingle patching in places. | Falmouth Town | — |
| Jul 16, 2026 | RESI. | residing of north facing basement wall. repair of rotted framing in north basement wall. installation of titenhd anchors to replace old foundation bolts. instal | Falmouth Town | — |
| Jun 23, 2026 | REP | reside full east side, new trim, flashing and exterior air sealing. patchwork shingle and trim replacement on other sides of house. | Falmouth Town | — |
| Jun 2, 2026 | RESI. | demolition of second floor deck and exterior stairs in back of the building. installation of structural fixes in back sunroom and screened in porch per structur | Falmouth Town | — |
| May 12, 2026 | REP | demolish second floor deck and install new permanent screens and structural railings over doors that lead out onto second floor deck. installation of siding ove | Falmouth Town | — |
| May 7, 2026 | RESI. | fully replace rotting basement 2x4 wall with 2x6. sheathing to be 3/4" ccx plywood, bottom plate to be pt. new 5/8"x6" simpson titen hd foundation anchors to co | Falmouth Town | — |
| Dec 12, 2025 | REP | strip siding on driveway side of house, up to lower soffit of main roof. replace rotted trim and inadequate flashing details. replace rotted trim on front step. | Falmouth Town | — |
| Dec 1, 2025 | RESI. | installation of intumescent coating over existing attic spray foam. no additional two part spray foam will be added, small amounts of single part fireblock rate | Falmouth Town | — |
Permit status
Where its permits stand, as the departments report them.
- Issued6
- Additional information required3
- Closed1
- Withdrawn1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.