Contractor · Electrical

A1 SUN INC

11 building permits since 2015 in Contra Costa County, CA; Marin County, CA and Berkeley city, CA, across 3 counties — $153,487 in reported job value over 7 permits that state one.

Building permits
11
Reported job value
$153.5K
Active
2015–2026
Latest permit
Oct 6, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Contra Costa County, CA3
  • Marin County, CA3
  • Berkeley city, CA3
  • Oakland city, CA1
  • San Pablo city, CA1

Permits by year

By issue date (application date where there is none).

048
8
201520192026*
* 2026 is year to date.
View as table
YearPermits
20152
20191
2026 (YTD)8

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar9
  • Battery storage6
  • Electrical6
  • Roofing4
  • Remodels1
  • EV chargers1

Permit types

As the building departments classify them.

  • Electrical4
  • PVR3
  • RESIDENTIAL3
  • ELECTRICAL/ALTERATION1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 6, 2026PVRInstall 0.88kW (DC) / 0.70 kW (AC) KW PV solar panels (2 modules) on the roof and (2) 10 kWh energy storage system (20 kWh total) w/ meter collar.Contra Costa County$42,340
Jul 2, 2026PVRInstall 7.360 (DC) / 6.06 (AC) kW PV solar panels (16 modules) on the roof and 20 kWh Energy Storage System.Contra Costa County$39,447
Jun 11, 2026ELECTRICAL/ALTERATIONInstall A EV charger circuit in EMT conduit, including NEMASan Pablo City$1,500
Apr 27, 2026PVR6.16 kW Solar PV Installation (14 modules). 10kWh Energy Storage System.Contra Costa County$31,000
Mar 31, 2026ElectricalNew 8.8kw solar pv installation. 20kwh energy storage system.Oakland City—
Mar 4, 2026ElectricalInstall 4.1 (dc) / 3.8 (ac) kw pv solar panels (10 modules) on the detached garage roof.Berkeley City—
Feb 12, 2026ElectricalInstall 9.68 (dc) / 7.68 (ac) kw pv solar panels (22 modules) on the roof with a 20 kwh energy storage system. "high severity" fire zone property.Berkeley City—
Jan 28, 2026ElectricalAdd two (2) 5.0 kwh batteries (10 kwh total) to existing pv solar & four (4) 5.0 kwh batteries.Berkeley City—

Permit status

Where its permits stand, as the departments report them.

  • Active3
  • Issued3
  • Not stated3
  • Finaled2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.