Contractor · General building

561 30TH AVENUE LLC

11 building permits since 2025 in Santa Cruz County, CA.

Building permits
11
Reported job value
—
Active
2025–2026
Latest permit
Feb 10, 2026

Where it works

Counties shaded by permits filed there.

Permits by county, fewer to more

Busiest jurisdictions

  • Santa Cruz County, CA11

Permits by year

By issue date (application date where there is none).

0510
10
20252026*
* 2026 is year to date.
View as table
YearPermits
202510
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar6
  • Accessory dwelling units3
  • HVAC3
  • Bathrooms3
  • Battery storage2
  • Electrical2
  • Remodels1
  • Roofing1

Permit types

As the building departments classify them.

  • Building11

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Feb 10, 2026BuildingConstruction Change Document #2 to B-256332 to include the following: Substitute ADX plywood in lieu of gypsum board as interior finish material.Santa Cruz County—
Dec 9, 2025BuildingConstruction Change Document #1 to Permit B-251199 (Master Application APP-251001) to include following: Replace deteriorated exterior wall and roof framing witSanta Cruz County—
Dec 2, 2025BuildingConstruction Change Document #1 to DEF Permit B-253964 to include following: Equipment location changed.Santa Cruz County—
Nov 24, 2025BuildingConstruction Change Document #1 to DEF PV Permit B-253959 to include following: Equipment location changed.Santa Cruz County—
Oct 1, 2025BuildingConstruct a detached 640 SF habitable structure (workshop) at existing SFD. Verify and/or install listed smoke and carbon monoxide alarms, or combination alarmsSanta Cruz County—
Jul 9, 2025BuildingDeferred Submittal # 1 to building permit B-251199 to include the following: Install a roof mount (7.82)kW, (17) modules photovoltaic electrical system not to eSanta Cruz County—
Jul 7, 2025BuildingDeferred Submittal # 1 to building permit B-251200 for the following; Install a roof mount (4.6)kW, (10) modules photovoltaic electrical system not to exceed 32Santa Cruz County—
Jun 4, 2025BuildingRestore and relocate (E) 2,240 SF 3-bedroom, 2-bath SFD with a 196 SF of covered porch. Verify and/or install listed smoke and carbon monoxide alarms, or combinSanta Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed7
  • Active4

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.