Contractor · Specialty (solar, fire, telecom)

BRIGHT OPS

182 building permits since 2020 in San Pablo city, CA; Riverside city, CA and Tuolumne County, CA, across 9 counties — $4,939,856 in reported job value over 141 permits that state one.

Building permits
182
Reported job value
$4.9M
Active
2020–2026
Latest permit
Jul 29, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • San Pablo city, CA77
  • Riverside city, CA29
  • Tuolumne County, CA25
  • Merced city, CA15
  • Cypress city, CA14
  • Anaheim city, CA7
  • Elk Grove city, CA5
  • Contra Costa County, CA3
  • Santa Cruz city, CA3
  • Campbell city, CA1

Permits by year

By issue date (application date where there is none).

04080
64
20202023202420252026*
* 2026 is year to date.
View as table
YearPermits
20201
20231
202464
202563
2026 (YTD)46

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar174
  • Battery storage79
  • Electrical31
  • Roofing23
  • Windows & doors9
  • HVAC8
  • Plumbing8
  • Electric meters3
  • Accessory dwelling units1
  • Remodels1

Permit types

As the building departments classify them.

  • BUILDING/SOLAR WITH ENERGY STORAGE42
  • BUILDING/SOLAR30
  • Residential29
  • Residential Roof Mount Solar (15 kw or less)20
  • SolarAPP13
  • SolarAPP+ Solar Permit9
  • ELECTRICAL5
  • BUILDING/SOLAR BATTERY4

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jul 29, 2026PVRPV Solar roof mount, 17 modules, 6.885 kW/DC, 11.5 kW/AC, tying into new subpanel, 1 ESS + backup switch (PCS controlled)Contra Costa County$27,770
Jun 23, 2026PVRRMS,25MODS,(2)Batteries,NEW MSP200AContra Costa County$19,750
Apr 28, 2026PVRroof mounted pv system 29 modules 11.745 kw, 1 Tesla battery 13.5kwhContra Costa County$23,490
Apr 6, 2026BUILDING/SOLARRoof mounted solar, 8 mods, 3.28kW, MPU 225San Pablo City$24,060
Apr 6, 2026BUILDING/SOLAR BATTERYNew ESS tesla powerwall 3 (13.5kWh)San Pablo City$24,060
Mar 26, 2026ElectricalSolar roof mount,mpu,200/a buss ,60/a main breaker,3.28kw,8 mods,1 tesla powerwall 3 battery w/buiConcord City—
Mar 24, 2026Residential Roof Mount Solar (15 kw or less)—Tuolumne County$21,020
Mar 23, 2026BUILDING/SOLAR BATTERY125A ELP, Tesla PW3 + Gateway3San Pablo City—

Permit status

Where its permits stand, as the departments report them.

  • Finaled45
  • Active40
  • Not stated32
  • Expired18
  • Issued17
  • Completed17
  • Closed5
  • Stop work ordered3

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.