Contractor · General building

150 Motor Parkway LLC

11 building permits since 2022 in Smithtown town, NY.

Building permits
11
Reported job value
—
Active
2022–2023
Latest permit
Apr 19, 2023

Where it works

Counties shaded by permits filed there.

Permits by county, fewer to more

Busiest jurisdictions

  • Smithtown town, NY11

Permits by year

By issue date (application date where there is none).

048
7
20222023
View as table
YearPermits
20227
20234

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical9
  • Remodels8
  • Plumbing5
  • Demolition5
  • Bathrooms2

Permit types

As the building departments classify them.

  • COMMERCIAL INTERIOR ALTERATIONS8
  • DEMOLITION3

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Apr 19, 2023COMMERCIAL INTERIOR ALTERATIONSFirst floor interior alterations 1,871 sq. ft. with plumbing and electric to an existing commercial building - Suite 129; First National BankSmithtown Town—
Mar 8, 2023DEMOLITIONMinor interior wall demolition and construct interior wall 40 sq.ft. (Suite 410) in an existing commercial building; 150 Motor Parkway LLCSmithtown Town—
Feb 15, 2023DEMOLITIONInterior demolition/vanilla box to Suites 125 & 127 (1,861 sq.ft. - Bank Vault) with electric to an existing commercial building; 150 Motor Parkway, LLC - DamiaSmithtown Town—
Feb 15, 2023DEMOLITIONInterior demolition to Suites LL-25 and LL-29 (3,981 sq.ft.) to an existing commercial building; 150 Motor Parkway LLC - Damianos RealtySmithtown Town—
Oct 19, 2022COMMERCIAL INTERIOR ALTERATIONSSUPERCEDED WITH PN 230480 - C/O ISSUED 9/8/23 Third floor demolition and interior alterations 8,503 sq.ft. with electric and plumbing to create ''vanilla box'' Smithtown Town—
Oct 5, 2022COMMERCIAL INTERIOR ALTERATIONSLobby interior alterations to 1,122 sq. ft. total (basement 3.026 sq. ft., first floor 562 sq. ft.) with plumbing and electric to basement to an existing commerSmithtown Town—
Jun 24, 2022COMMERCIAL INTERIOR ALTERATIONSInterior alterations 965 sq.ft. to basement with electric to an existing commercial building; 150 Motor Parkway Business Use, Type 2A ConstructionSmithtown Town—
Mar 9, 2022COMMERCIAL INTERIOR ALTERATIONSInterior alterations to men's and ladies' bathrooms on lower level, first floor, second floor, third floor and fourth floor 4,540 sq.ft. total with plumbing andSmithtown Town—

Permit status

Where its permits stand, as the departments report them.

  • Closed10
  • Withdrawn1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.