Contractor · Electrical
WaveRider Electric & Automation LLC
12 building permits since 2025 in Brunswick County, NC; Ocean Isle Beach town, NC and Oak Island town, NC — $49,519 in reported job value over 8 permits that state one.
- Building permits
- 12
- Reported job value
- $49.5K
- Active
- 2025–2026
- Latest permit
- Oct 13, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Brunswick County, NC6
- Ocean Isle Beach town, NC3
- Oak Island town, NC2
- Sunset Beach town, NC1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2025 | 1 |
| 2026 (YTD) | 11 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical11
- EV chargers6
- Generators2
- Electric meters2
Permit types
As the building departments classify them.
- ELECTRICAL5
- ELECTRIC2
- Electrical - Commercial2
- Electrical - Residential1
- RECONNECT1
- Trade - Electrical1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 13, 2026 | Electrical - Commercial | Installing temporary power poles for Oyster Festival. You can reference permit #1123 from last year as nothing has changed. | Ocean Isle Beach | — |
| Sep 22, 2026 | ELECTRIC | EV CHARGER INSTALLATIPN - 60 AMP 2 POLE CIRCUIT BREAKER IN METER MAIN PANEL WITH 3/4 INCH PVC CONDUIT RUN. 6 AWG COPPER WITH 10 AWG GROUND TO TESLA UNIVERAL WAL | Oak Island | $1,900 |
| Sep 22, 2026 | ELECTRICAL | Tesla EV Charger Installation. Hardwired 60amp circuit surface run 3/4 inch pvc conduit. #6 copper with #10ground. | Brunswick County | $1,500 |
| Sep 22, 2026 | ELECTRICAL | EV Charger installation in garage. | Brunswick County | $1,000 |
| Sep 22, 2026 | ELECTRICAL | Install EV Charger in garage adjacent to electrical panel. | Brunswick County | $1,500 |
| Sep 22, 2026 | Trade - Electrical | — | Sunset Beach | — |
| Aug 25, 2026 | Electrical - Residential | EV charger installation | Ocean Isle Beach | — |
| Jul 15, 2026 | ELECTRIC | Replace meter base and 200amp main disconnect | Oak Island | $1,900 |
Permit status
Where its permits stand, as the departments report them.
- Active5
- Closed3
- Approved2
- Void1
- Completed1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.