Contractor · Electrical

WATSON'S CHARGING STATIONS & ELECTRIC INC

12 building permits since 2024 in Capitola city, CA; Monterey County, CA and Santa Clara County, CA, across 4 counties — $4,950 in reported job value over 6 permits that state one.

Building permits
12
Reported job value
$5K
Active
2024–2026
Latest permit
Sep 2, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Capitola city, CA3
  • Monterey County, CA2
  • Santa Clara County, CA2
  • Scotts Valley city, CA2
  • San Mateo County, CA1
  • Cupertino city, CA1
  • Santa Clara city, CA1

Permits by year

By issue date (application date where there is none).

048
8
202420252026*
* 2026 is year to date.
View as table
YearPermits
20242
20252
2026 (YTD)8

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical11
  • EV chargers11
  • Electric meters1

Permit types

As the building departments classify them.

  • Electrical7
  • B-Residential3
  • Residential Building Permit2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 2, 2026Residential Building PermitInstalllation of Level 2 30A Emporia EV Chargimg stationScotts Valley City$700
Mar 30, 2026ElectricalInstall tesla wall connector with tesla power meter add-on for load management.San Mateo County—
Mar 14, 2026ElectricalReplace existing 125a main panel (like-for-like). Replace existing 100a sub-panel with new span sub-panel. Install dedicated level 2 ev charging circuit and spaSanta Clara City—
Mar 12, 2026ElectricalInstallation of level 2 60a ev charging stationMonterey County$700
Mar 4, 2026ElectricalInstallation of level 2 60a emporia ev charging stationMonterey County$700
Feb 20, 2026ElectricalEv charging stationSanta Clara County—
Feb 2, 2026ElectricalReplace existing 200a panel with new 200a panel in the same locationSanta Clara County—
Jan 22, 2026ElectricalUpgrade panel (200amp) - same location rev no.1 - install (n) 200a subpanel next to main panel; (n) electrical vehicle charging station (48a) on exterior wall oCupertino City—

Permit status

Where its permits stand, as the departments report them.

  • Finaled5
  • Active4
  • Issued2
  • Completed1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.