Contractor · Electrical
NORMAN METCALF ELECTRIC INC
183 building permits since 2017 in Sacramento city, CA; Elk Grove city, CA and Sacramento County, CA — $901,116 in reported job value over 183 permits that state one.
- Building permits
- 183
- Reported job value
- $901.1K
- Active
- 2017–2026
- Latest permit
- Sep 24, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Sacramento city, CA176
- Elk Grove city, CA4
- Sacramento County, CA3
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2017 | 1 |
| 2021 | 21 |
| 2022 | 50 |
| 2023 | 44 |
| 2024 | 19 |
| 2025 | 23 |
| 2026 (YTD) | 25 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical182
- EV chargers9
- Electric meters5
- HVAC3
- Plumbing2
- Accessory dwelling units1
- Remodels1
- Roofing1
- Water heaters1
Permit types
As the building departments classify them.
- Single Family161
- Duplex9
- Apts 3-43
- ELECTRICAL3
- PANR2
- Apts 5+1
- Industrial1
- MISR1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 24, 2026 | Single Family | E-Permit: existing panel 100 Amps - Overhead service, new main panel 200 Amps, New Install weather head/masthead work. | Sacramento | $6,400 |
| Sep 3, 2026 | Single Family | Electrical Permit: Upgrade and relocation of main panel from 100 amps to 200 amps. Main panel will be moved approximately 20 feet to the left on the same back w | Sacramento | $7,500 |
| Aug 25, 2026 | Single Family | E-Permit: existing panel 125 Amps - Underground service, new main panel 125 Amps, N/A weather head/masthead work. | Sacramento | $5,800 |
| Aug 24, 2026 | Single Family | EV Charger Permit: Installation of a 40 amp 240 volt circuit for a 32 amp hardwired EV charger. Installation will be in 8/3 copper Romex ran under the house to | Sacramento | $3,100 |
| Aug 18, 2026 | Single Family | EPC - Installation of a 40 amp 240 volt circuit for a 32 amp hardwired EV charger at the front of the driveway. Circuit will be installed in 8/3 copper Romex th | Sacramento | $3,100 |
| Aug 3, 2026 | Single Family | E-Permit: existing panel 125 Amps - Overhead service, new main panel 200 Amps, New Install weather head/masthead work, main breaker replacement. | Sacramento | $6,400 |
| Aug 3, 2026 | Single Family | E-Permit: existing panel 100 Amps - Overhead service, new main panel 200 Amps, New Install weather head/masthead work, main breaker replacement. | Sacramento | $7,400 |
| Aug 3, 2026 | Single Family | E-Permit: existing panel 100 Amps - Overhead service, new main panel 200 Amps, New Install weather head/masthead work, main breaker replacement. | Sacramento | $5,800 |
Permit status
Where its permits stand, as the departments report them.
- Issued176
- Closed4
- Finaled1
- Completed1
- Reviews in progress1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.