Contractor · Electrical

TRIPLE M HOMES

12 building permits since 2020 in Los Angeles city, CA; Norwalk city, CA and Burbank city, CA.

Building permits
12
Reported job value
—
Active
2020–2026
Latest permit
Jan 30, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA7
  • Norwalk city, CA4
  • Burbank city, CA1

Permits by year

By issue date (application date where there is none).

024
4
20202021202220232026*
* 2026 is year to date.
View as table
YearPermits
20202
20214
20222
20233
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical11
  • Solar8

Permit types

As the building departments classify them.

  • Electrical8
  • Solar Panel2
  • Residential Electrical1
  • Solar Panel - Residential & PC1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jan 30, 2026ElectricalInstall 4 pv modules (1.62kw) with 4 micro-inverters. Symbium-project_ff434d0f-0fb8-49ed-b29d-8d2ca4ca9e32Burbank City—
Feb 9, 2023Electrical[eplan] Installing a 9.49 kW DC/ 10KW AC roof mounted PV system witLos Angeles City—
Feb 8, 2023ElectricalEplan for rooftop solar system, with system size 5.475 kW. Using 15 moLos Angeles City—
Feb 2, 2023Solar PanelNEW SOLAR PHOTOVOLTAIC 5.475KW DC SYSTEM WITH (15) MODULES, (15) SOLAREDGE OPTIMIZERS AND (N) SOLAREDGE TECHNOLOGIES INVERTER. (PC:BS2204584)Norwalk City—
Jul 26, 2022Electrical[ePlan] New solar PV1 system with (44) modules, (44) P401 power optimiLos Angeles City—
May 12, 2022ElectricalEplan: Plan check for a New pv1 Roof mounted 10.44 kW DC / 10KW AC SolLos Angeles City—
May 18, 2021Electrical$0 permit fees due to AB 1414. [Eplan] Installation of a roof top solLos Angeles City—
May 18, 2021Electrical(EPlan) PV1 PC for installation of roof mounted solar panels. PV systLos Angeles City—

Permit status

Where its permits stand, as the departments report them.

  • Not stated7
  • Completed3
  • Finaled2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.