Contractor · Electrical

Tjoelker

12 building permits since 2023 in Los Angeles city, CA.

Building permits
12
Reported job value
—
Active
2023
Latest permit
May 18, 2023

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA12

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical12
  • Solar9

Permit types

As the building departments classify them.

  • Electrical12

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
May 18, 2023ElectricalEplan: Install 7.6 kW DC/ 6KW AC roof-mounted PV system with 19 modulLos Angeles City—
May 6, 2023ElectricalEplan: Install 8 kW DC / 6KW AC roof mount PV system with 20 modulesLos Angeles City—
May 6, 2023ElectricalEplan: Install 9.6 kW DC/ 7.6KW AC roof-mount PV system with 24 modulLos Angeles City—
May 5, 2023Electrical[ePlan] PV1 PC for installation of roof mounted solar panels. PV systeLos Angeles City—
May 2, 2023Electrical[eplan] pv1 Install 4.8 kW DC/3.8 KW AC roof-mount PV system with 12 mLos Angeles City—
May 1, 2023Electrical[EPLAN] Install a 1.6 kW DC/ 1.1KW AC roof-mount PV system with 4 modLos Angeles City—
Apr 28, 2023Electrical[EPLAN] PV1 NEW ROOFTOP MOUNTED SYSTEM,. SYSTEM INCLUDES 15 MODULES WILos Angeles City—
Apr 21, 2023Electrical[EPLAN] PV1 NEW ROOFTOP MOUNTED SYSTEM, SYSTEM SIZE IS 5KWac, SYSTEM ILos Angeles City—

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.