Contractor · Specialty (solar, fire, telecom)
Titan Solar NC
12 building permits since 2021 in Warren County, NC; Southport city, NC and Lenoir County, NC, across 4 counties — $134,220 in reported job value over 10 permits that state one.
- Building permits
- 12
- Reported job value
- $134.2K
- Active
- 2021–2024
- Latest permit
- May 16, 2024
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Warren County, NC5
- Southport city, NC4
- Lenoir County, NC2
- Roanoke Rapids city, NC1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2021 | 4 |
| 2022 | 2 |
| 2023 | 4 |
| 2024 | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar11
- Electrical6
- Battery storage2
Permit types
As the building departments classify them.
- Electrical Permit5
- Residential Building Permit3
- Building Permit2
- Electric Permit Application1
- Residential Building Permit Application1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| May 16, 2024 | Residential Building Permit Application | installing 20 roof-mounted solar panels, 8.4kW | Lenoir County | $16,800 |
| Apr 24, 2024 | Electric Permit Application | installing 20 roof-mounted solar panels, 8.4kW | Lenoir County | — |
| Sep 5, 2023 | Electrical Permit | Rooftop Solar Installation 6.15kW(15 panels) | Roanoke Rapids City | — |
| May 31, 2023 | Residential Building Permit | Rooftop Solar Installation 6.4kW(16 panels) | Warren County | $12,800 |
| Apr 13, 2023 | Electrical Permit | 1 Tesla Powerwall 5kW 13.5 kWh | Warren County | $10,000 |
| Jan 18, 2023 | Electrical Permit | Adding Tesla Powerwall to solar system. | Warren County | $10,000 |
| Oct 12, 2022 | Residential Building Permit | Rooftop Solar Installation 12kW(30 panels) | Warren County | $24,000 |
| Sep 9, 2022 | Residential Building Permit | Rooftop Solar Installation 6kW(15 panels) | Warren County | $12,000 |
Permit status
Where its permits stand, as the departments report them.
- Active5
- Completed5
- Stop work ordered2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.