Contractor · Demolition & excavation

souza, david k.

12 building permits since 2013 in Falmouth town, MA and Wellesley town, MA, across 2 counties — $2,850,000 in reported job value over 4 permits that state one.

Building permits
12
Reported job value
$2.9M
Active
2013–2015
Latest permit
Jul 28, 2015

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Falmouth town, MA8
  • Wellesley town, MA4

Permits by year

By issue date (application date where there is none).

048
7
201320142015
View as table
YearPermits
20134
20147
20151

Type of work

Permits describing each kind of work; one permit can cover several.

  • Demolition7
  • HVAC1
  • Electrical1
  • Windows & doors1
  • New construction1

Permit types

As the building departments classify them.

  • COMM.6
  • Building Permit - Commercial2
  • RESI.2
  • COM: DEMOLITION1
  • COM: NEW BUILDING1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jul 28, 2015COMM.existing leasing center, reside the building, install 13 windows and rework interior sheet rock and trimFalmouth Town—
Oct 28, 2014COMM.cvs - construction of a new slab on grade pharmacy/retail store of appx 17,480 sq ft in area which includes a receiving/storage area ***construction control barFalmouth Town—
Oct 21, 2014COMM.demolition of entire structure of existing cvs/pharmacy located at 105 davis straits. *** see health dept notes on hazardous & toxic materials *** ******** demoFalmouth Town—
Sep 16, 2014COMM.#97 - demolition of existing structure ***contractor must have property surveyed for lead paint, asbestos materials, mercury containing devices and any other haFalmouth Town—
Sep 16, 2014COMM.#95 - demolition of existing structure ***contractor must have property surveyed for lead paint, asbestos materials, mercury containing devices and any other haFalmouth Town—
Sep 16, 2014RESI.demolition of existing structure ***contractor must have property surveyed for lead paint, asbestos materials and mercury containing devices (or any other hazarFalmouth Town—
Sep 16, 2014RESI.#93 - demolition of existing structure - contractor must have property surveyed for lead paint, asbestos materials, mercury containing devices and any othe hazaFalmouth Town—
Apr 29, 2014COMM.construct two (2) new stair towers with elevators, new mechanical and electrical services. upgrade all units and building to make it hc accessible. con com dep Falmouth Town—

Permit status

Where its permits stand, as the departments report them.

  • Closed8
  • Issued2
  • Completed2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.