Contractor · General building
ROOFSIMPLE INC
12 building permits since 2026 in Howard County, MD — $330,393 in reported job value over 9 permits that state one.
- Building permits
- 12
- Reported job value
- $330.4K
- Active
- 2026
- Latest permit
- Aug 4, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Howard County, MD12
Type of work
Permits describing each kind of work; one permit can cover several.
- Remodels11
- Roofing11
- Solar4
- Additions3
- Electrical3
- Battery storage2
Permit types
As the building departments classify them.
- Residential Interior Alteration Single Family Dwelling Permit7
- Residential Electrical Addition Alteration Permit3
- Residential Interior Alteration Townhouse Permit1
- Solar Express (Residential Only)1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 4, 2026 | Residential Interior Alteration Single Family Dwelling Permit | SFD/ Replacing ~ 49SQ of asphalt shingle with a GAF Systems+ roofing system. Partial redecking possible as necessary**SUBJECT TO FIELD INSPECTION** | Howard County | $40,548 |
| Aug 4, 2026 | Residential Interior Alteration Single Family Dwelling Permit | SFD/ Replacing ~35SQ of asphalt shingles with a CertainTeed Landmark Pro roofing system. Potential partial redecking, as necessary**SUBJECT TO FIELD INSPECTION* | Howard County | $24,471 |
| Aug 4, 2026 | Residential Interior Alteration Single Family Dwelling Permit | SFD/ Replacing the asphalt shingles (~49SQ) with a GAF Systems+ roofing system using HDZ Charcoal Shingles. Possible partial re-decking, as needed**SUBJECT TO F | Howard County | $31,871 |
| Jul 28, 2026 | Residential Electrical Addition Alteration Permit | INSTALL (21) 9.45 kW DC of roof mounted solar panels on the front facing roof | Howard County | — |
| Jul 28, 2026 | Residential Electrical Addition Alteration Permit | Installation of 30 solar panels that will be mounted and flush with the roof | Howard County | — |
| Jul 27, 2026 | Residential Electrical Addition Alteration Permit | Installation of 30 solar panels that will be mounted and flush with the roof as well as one back up battery; Doing service work (200 amps) | Howard County | — |
| Jun 25, 2026 | Solar Express (Residential Only) | 30 solar panels at 13.8 kW DC mounted on the front facing roofs of the house as well as 1 back up battery 30 PANELS, EXISTING USE: SFD | Howard County | $33,000 |
| Jun 22, 2026 | Residential Interior Alteration Single Family Dwelling Permit | SFD/ RE ROOF TO INCLUDE UHDZ shingles, UNDERLAYMENT, NECESSARY REDECKING**SUBJECT TO FIELD INSPECTION** | Howard County | $62,056 |
Permit status
Where its permits stand, as the departments report them.
- Issued8
- Completed4
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.