Contractor · Plumbing

RODRIGUEZ GERALD & MARY ANN TRUSTEES

12 building permits since 2010 in Santa Cruz County, CA.

Building permits
12
Reported job value
—
Active
2010–2026
Latest permit
Jul 8, 2026

Where it works

Counties shaded by permits filed there.

Permits by county, fewer to more

Busiest jurisdictions

  • Santa Cruz County, CA12

Permits by year

By issue date (application date where there is none).

036
6
201020112014201820192026*
* 2026 is year to date.
View as table
YearPermits
20101
20111
20141
20182
20191
2026 (YTD)6

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar5
  • Plumbing4
  • Electrical3
  • Roofing2
  • EV chargers2
  • Water heaters2
  • Gas1
  • Battery storage1
  • Additions1

Permit types

As the building departments classify them.

  • Building12

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jul 8, 2026BuildingSeismic strengthening of underfloor area to reduce risk of damage per Standard Plan A (2008). Verify and/or install listed smoke and carbon monoxide alarms, or Santa Cruz County—
May 7, 2026BuildingElectrical permit for the addition of (1) 125A sub panel at existing SFD. Verify and/or install listed smoke and carbon monoxide alarms, or combination alarms, Santa Cruz County—
May 7, 2026BuildingRemoval and re-installation of existing PV system permitted under approved permit B-261291. Re-installation must be completed by a licensed PV installer, per thSanta Cruz County—
May 6, 2026BuildingNote state license type and must have W/C Ins. Tear-off or overlay roof at an existing structure >600 sq ft, install new sheathing as required with class-B or bSanta Cruz County—
May 4, 2026BuildingElectrical permit includes new wiring/lights/switches, throughout the entire existing SFD. Verify and/or install listed smoke and carbon monoxide alarms, or comSanta Cruz County—
Feb 11, 2026BuildingInstall a roof mount (3.28)kW, (8) modules photovoltaic electrical system not to exceed 32 feet in height and a (13.5)kWh, (1) battery energy storage system on Santa Cruz County—
Nov 18, 2019BuildingTear off roofing at an existing SFD and install new sheathing if required and class B or better (comp) roofing. Install listed smoke detectors and carbon monoxiSanta Cruz County—
Nov 6, 2018BuildingReplace water heater with associated piping and venting at an existing SFD. Install minimum 1.5" piping insulation for the first 5 feet of hot and cold water piSanta Cruz County—

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.

RODRIGUEZ GERALD & MARY ANN TRUSTEES — Building Permits & Contractor Profile | Buildstats