Contractor · Electrical

R C ELECTRIC, INC

12 building permits since 2020 in St. Louis County, MO; Ballwin city, MO and Chesterfield city, MO — $30,000 in reported job value over 12 permits that state one.

Building permits
12
Reported job value
$30K
Active
2020–2026
Latest permit
Oct 30, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • St. Louis County, MO8
  • Ballwin city, MO1
  • Chesterfield city, MO1
  • Lakeshire city, MO1
  • Town and Country city, MO1

Permits by year

By issue date (application date where there is none).

0510
10
20202026*
* 2026 is year to date.
View as table
YearPermits
202010
2026 (YTD)2

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical12
  • Electric meters7
  • Kitchens4
  • Plumbing2

Permit types

As the building departments classify them.

  • ELECTRICAL RESIDENTIAL ELECTRICAL12

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 30, 2026ELECTRICAL RESIDENTIAL ELECTRICALReplace existing non lever bypass meter. Replace existing 200a service entrance cable. Replace existing 200a main breaker panel. Replace existing 100a sub panelTown And Country City$3,000
Oct 30, 2026ELECTRICAL RESIDENTIAL ELECTRICALReplace existing non lever bypass meter. Replace existing 200a service entrance cable. Replace existing 200a main breaker panel. Replace existing 100a sub panelSt. Louis County$3,000
Dec 16, 2020ELECTRICAL RESIDENTIAL ELECTRICALReplace existing 200a electrical service with new 200a service and mast. Drive ground rod, install bonding bridge, run interior water pipe ground, install new 2St. Louis County$1,500
Sep 25, 2020ELECTRICAL RESIDENTIAL ELECTRICAL***WE HAVE NO PERMIT JURISDICTION IN BALLWIN - PLEASE CONTACT THE MUNICIPALITY - THANX!***Customer completed some electrical work inside of retail store. OccupaSt. Louis County$1,000
Sep 25, 2020ELECTRICAL RESIDENTIAL ELECTRICAL***WE HAVE NO PERMIT JURISDICTION IN BALLWIN - PLEASE CONTACT THE MUNICIPALITY - THANX!***Customer completed some electrical work inside of retail store. OccupaBallwin$1,000
Aug 26, 2020ELECTRICAL RESIDENTIAL ELECTRICALReplace existing electrical meter with new lever bypass 200a overhead. Replace riser and all fittings. Replace entrance cable and federal pacific panel. ReplaceSt. Louis County$2,000
Aug 26, 2020ELECTRICAL RESIDENTIAL ELECTRICALReplace existing electrical meter with new lever bypass 200a overhead. Replace riser and all fittings. Replace entrance cable and federal pacific panel. ReplaceLakeshire City$2,000
Aug 11, 2020ELECTRICAL RESIDENTIAL ELECTRICALInstall two new circuits for kitchen outlets. Install two new circuits for garage. Install four cans and ceiling fan on back deck. Install three switches for liSt. Louis County$1,000

Permit status

Where its permits stand, as the departments report them.

  • Completed7
  • Void3
  • Issued2

Also on file as

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.