OME SOLAR LLC
12 building permits since 2022 in Howard County, MD and Rockville city, MD, across 2 counties — $8,247,483 in reported job value over 10 permits that state one.
- Building permits
- 12
- Reported job value
- $8.2M
- Active
- 2022–2026
- Latest permit
- Oct 9, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Howard County, MD10
- Rockville city, MD2
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2022 | 6 |
| 2024 | 4 |
| 2026 (YTD) | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar12
- Electrical3
- Roofing1
Permit types
As the building departments classify them.
- Commercial Miscellaneous Permit10
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 9, 2026 | Commercial Miscellaneous Permit | GLENWOOD LIBRARY/OME Solar is installing a 179 KW DC net metered rooftop solar photovoltaic generating system with 328 panels. This will be a ballasted system w | Howard County | $448,438 |
| Sep 3, 2026 | Commercial Miscellaneous Permit | HOWARD COUNTY MILLER LIBRARY AND SENIOR CENTER/ OME Solar is installing a 152.1 KW DC net metered rooftop solar system on the Howard County Miller Building. The | Howard County | $401,045 |
| Aug 1, 2024 | Commercial Miscellaneous Permit | Howard County Library System/ construction of a 994.84 KW DC solar canopy system that will cover the parking lot at East Columbia Library. This solar system wil | Howard County | $3,000,000 |
| Jul 29, 2024 | Commercial Miscellaneous Permit | EAST COLUMBIA LIBRARY/ INSTALL (85) ROOF MOUNT SOLAR PANELS./*AMENDMENT SUBMITTED 10/08 TO CHANGE ADDRESS TO 6610 CRADLE ROCK WAY*/*11.26.24 AMENDMENT REQUEST T | Howard County | $200,000 |
| Jan 29, 2024 | — | Design, procure and install 173KW DC solar system installed on the rooftop. The system design will meet 100% of the building current electricity load. | Rockville City | — |
| Jan 29, 2024 | — | Design, procure and install 137.28 KW DC Solar system installed on the rooftop. The system design will meet 100%of the building's current electricity load. | Rockville City | — |
| Nov 2, 2022 | Commercial Miscellaneous Permit | HOWARD COUNTY EAST COLUMBIA BRANCH LIBRARY/ INSTALL (433) ROOF-MOUNTED SOLAR PANELS | Howard County | $275,000 |
| Sep 28, 2022 | Commercial Miscellaneous Permit | HOWARD COUNTY PUBLIC SAFETY COMPLEX/ INSTALL (460) ROOF-MOUNTED SOLAR PANELS | Howard County | $125,000 |
Permit status
Where its permits stand, as the departments report them.
- Completed8
- Closed2
- Issued2