Contractor · Specialty (solar, fire, telecom)

OME SOLAR LLC

12 building permits since 2022 in Howard County, MD and Rockville city, MD, across 2 counties — $8,247,483 in reported job value over 10 permits that state one.

Building permits
12
Reported job value
$8.2M
Active
2022–2026
Latest permit
Oct 9, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Howard County, MD10
  • Rockville city, MD2

Permits by year

By issue date (application date where there is none).

036
6
202220242026*
* 2026 is year to date.
View as table
YearPermits
20226
20244
2026 (YTD)2

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar12
  • Electrical3
  • Roofing1

Permit types

As the building departments classify them.

  • Commercial Miscellaneous Permit10

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 9, 2026Commercial Miscellaneous PermitGLENWOOD LIBRARY/OME Solar is installing a 179 KW DC net metered rooftop solar photovoltaic generating system with 328 panels. This will be a ballasted system wHoward County$448,438
Sep 3, 2026Commercial Miscellaneous PermitHOWARD COUNTY MILLER LIBRARY AND SENIOR CENTER/ OME Solar is installing a 152.1 KW DC net metered rooftop solar system on the Howard County Miller Building. TheHoward County$401,045
Aug 1, 2024Commercial Miscellaneous PermitHoward County Library System/ construction of a 994.84 KW DC solar canopy system that will cover the parking lot at East Columbia Library. This solar system wilHoward County$3,000,000
Jul 29, 2024Commercial Miscellaneous PermitEAST COLUMBIA LIBRARY/ INSTALL (85) ROOF MOUNT SOLAR PANELS./*AMENDMENT SUBMITTED 10/08 TO CHANGE ADDRESS TO 6610 CRADLE ROCK WAY*/*11.26.24 AMENDMENT REQUEST THoward County$200,000
Jan 29, 2024—Design, procure and install 173KW DC solar system installed on the rooftop. The system design will meet 100% of the building current electricity load.Rockville City—
Jan 29, 2024—Design, procure and install 137.28 KW DC Solar system installed on the rooftop. The system design will meet 100%of the building's current electricity load.Rockville City—
Nov 2, 2022Commercial Miscellaneous PermitHOWARD COUNTY EAST COLUMBIA BRANCH LIBRARY/ INSTALL (433) ROOF-MOUNTED SOLAR PANELSHoward County$275,000
Sep 28, 2022Commercial Miscellaneous PermitHOWARD COUNTY PUBLIC SAFETY COMPLEX/ INSTALL (460) ROOF-MOUNTED SOLAR PANELSHoward County$125,000

Permit status

Where its permits stand, as the departments report them.

  • Completed8
  • Closed2
  • Issued2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.