Contractor · Electrical
NORSEMAN ELECTRIC
12 building permits since 2026 in Contra Costa County, CA — $57,505 in reported job value over 12 permits that state one.
- Building permits
- 12
- Reported job value
- $57.5K
- Active
- 2026
- Latest permit
- Sep 23, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Contra Costa County, CA12
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical10
- Electric meters8
- EV chargers2
- HVAC1
- Battery storage1
- Generators1
Permit types
As the building departments classify them.
- E12
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 23, 2026 | E | Remove 100 AMP Meter Main and replace with new 200 AMP Meter Main in a new location. | Contra Costa County | $5,800 |
| Aug 18, 2026 | E | Remove Federal Pacific panel in closet and flip into the hallway. | Contra Costa County | $4,380 |
| Aug 17, 2026 | E | Remove 200 AMP Meter Main and replace with new 200 AMP Meter Main (like for like) | Contra Costa County | $6,250 |
| Aug 7, 2026 | E | Remove 100 AMP Federal Pacific Meter Main and replace with new 200 AMP Meter Main in the same location. | Contra Costa County | $6,250 |
| Jul 24, 2026 | E | Remove and replace damaged 200 AMP Meter Main (Like for Like). | Contra Costa County | $5,500 |
| Jul 13, 2026 | E | Remove 100 AMP Meter Main and replace with new 100 AMP Meter Main. | Contra Costa County | $5,850 |
| Jul 6, 2026 | E | Install a portable generator/battery interlock panel. | Contra Costa County | $1,200 |
| Jun 1, 2026 | E | Increase garage sub panel from 60 AMPs to 100 AMPs. Install a 60 AMP EV charger. | Contra Costa County | $800 |
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.