Contractor · Electrical

N CLEAN ENERGY

12 building permits since 2022 in Los Angeles city, CA and Burbank city, CA.

Building permits
12
Reported job value
—
Active
2022–2026
Latest permit
Sep 11, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA9
  • Burbank city, CA3

Permits by year

By issue date (application date where there is none).

02.55
5
202220232026*
* 2026 is year to date.
View as table
YearPermits
20223
20234
2026 (YTD)5

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical10
  • Solar6

Permit types

As the building departments classify them.

  • Electrical10
  • Solar2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 11, 2026SolarInstall 35 PV modules (15.4KW) with Tesla Inc. inverter; install 1 ESS unit on an exterior wall. SYMBIUM-project_a62e841b-92eb-486d-aac9-320e08e1c8caBurbank City—
Jun 9, 2026SolarInstall 12 PV modules (5.28KW) with 12 micro-inverters. SYMBIUM-project_793aa769-c24b-4cd1-a0c6-c4ff84de4f27Burbank City—
Feb 22, 2026ElectricalInstall 5 pv modules (2.2kw) with 5 micro-inverters. Symbium-project_c0565d81-dca4-47f4-bbf1-b9e481a937ffBurbank City—
Feb 19, 2026ElectricalEplan] new pv system roof mount, pv1, scope of work include: (10) modules of 400 w, total: 4 kwdc (10) uinverter of 330 w, total: 3.3 kwac (1) stringLos Angeles City—
Feb 5, 2026ElectricalInstallation of a roof-mounted microinverter/ac module solar photovoltaic (pv) system, not exceeding 38.4kw in a 1 or 2 family dwelling.Los Angeles City—
Mar 11, 2023Electrical—Los Angeles City—
Mar 11, 2023Electrical—Los Angeles City—
Feb 6, 2023Electrical[ePlan][PV1] Installation of roof mounted solar system consisting of 3Los Angeles City—

Permit status

Where its permits stand, as the departments report them.

  • Not stated7
  • Finaled4
  • Active1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.