Contractor · Electrical

NATMAR POWER SYSTEMS INC

12 building permits since 2021 in San Diego County, CA.

Building permits
12
Reported job value
—
Active
2021–2023
Latest permit
Nov 2, 2023

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • San Diego County, CA12

Permits by year

By issue date (application date where there is none).

0510
9
202120222023
View as table
YearPermits
20211
20222
20239

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical8
  • Solar5

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Nov 2, 2023—GROUND MOUNT RESIDENTIAL SOLAR PV FOR EXISTING PERMITTED STRUCTURESan Diego County—
Oct 5, 2023—Existing Residential Main Electrical Service Upgrade - 225A - (Online Permit) *The scope of work is limited to upgrade of the existing main service panel. No neSan Diego County—
Aug 18, 2023—Existing Residential Main Electrical Service Upgrade - 200A - (Online Permit) *The scope of work is limited to upgrade of the existing main service panel. No neSan Diego County—
Aug 16, 2023—Existing Residential Main Electrical Service Upgrade - 225A - (Online Permit) *The scope of work is limited to upgrade of the existing main service panel. No neSan Diego County—
Jul 28, 2023—Existing Residential Main Electrical Service Upgrade - 200A - (Online Permit) *The scope of work is limited to upgrade of the existing main service panel. No neSan Diego County—
Apr 7, 2023—14KW GROUND MOUNT SOLAR W/ 225 AMP MSP UPGRADE FOR EXISTING SFDSan Diego County—
Mar 20, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade). This Permit does not exempt any existing structures from compliance witSan Diego County—
Feb 14, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade). This Permit does not exempt any existing structures from compliance witSan Diego County—

Permit status

Where its permits stand, as the departments report them.

  • Issued11
  • Active1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.