Contractor · Electrical
LGCY INSTALLATION SERVICES LLC
187 building permits since 2008 in Norwalk city, CA; San Diego city, CA and Vista city, CA, across 12 counties — $396,028 in reported job value over 20 permits that state one.
- Building permits
- 187
- Reported job value
- $396K
- Active
- 2008–2026
- Latest permit
- Aug 31, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Norwalk city, CA48
- San Diego city, CA30
- Vista city, CA18
- Fontana city, CA12
- Madera city, CA9
- Riverside County, CA7
- La Habra city, CA7
- Eastvale city, CA6
- Jurupa Valley city, CA6
- Kern County, CA5
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2008 | 1 |
| 2023 | 11 |
| 2024 | 34 |
| 2025 | 24 |
| 2026 (YTD) | 117 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical127
- Solar119
- Battery storage55
- Plumbing3
- Water heaters3
- Electric meters3
- Roofing2
- New construction2
- HVAC1
Permit types
As the building departments classify them.
- Electrical93
- Building Misc - Photovoltaic System (PV)17
- Solar Permit17
- Solar Panel16
- Residential Electrical13
- Real Time Photovoltaic Installation (Residential Only)5
- RESPVSOLAR4
- BLDG - Building (R)3
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 31, 2026 | Building Misc - Photovoltaic System (PV) | ROOF MOUNT SOLAR PHOTOVOLTAIC SYSTEM / BATTERY / MAIN PANEL UPGRADE 125 AMP | Vista City | — |
| Aug 24, 2026 | Building Misc - Photovoltaic System (PV) | ROOF MOUNT SOLAR PHOTOVOLTAIC SYSTEM / ENERGY STORAGE / 225A MAIN PANEL UPGRADE | Vista City | — |
| Jul 15, 2026 | Building Misc - Photovoltaic System (PV) | ROOF MOUNT PHOTOVOLTAIC SYSTEM / ENERGY STORAGE SYSTEM | Vista City | — |
| Jul 15, 2026 | Building Misc - Photovoltaic System (PV) | ROOF MOUNT SOLAR PHOTOVOLTAIC SYSTEM / ENERGY STORAGE SYSTEM | Vista City | — |
| Jul 2, 2026 | RESIDENTIAL | — | Marin County | $41,143 |
| Jun 30, 2026 | Solar Permit | 8 Q.PEAK DUO BLK ML-G10.C+ 410 SOLAR MODULES 8 Q.MI.349B-G1 {240V} MICROINVERTERS 1- 1707000-XX-Y {11.5KW} ESS NEW BUSBAR COUNT - 2 SYSTEM SIZE: 3.28 KW DC (2.7 | Norwalk City | — |
| Jun 29, 2026 | Building Misc - Photovoltaic System (PV) | ROOF MOUNT SOLAR PHOTOVOLTAIC SYSTEM / ENERGY STORAGE / 200A MAIN PANEL UPGRADE | Vista City | — |
| Jun 26, 2026 | Building Misc - Photovoltaic System (PV) | ROOF MOUNT SOLAR PHOTOVOLTAIC SYSTEM / BATTERY / MAIN PANEL UPGRADE 200 AMP | Vista City | — |
Permit status
Where its permits stand, as the departments report them.
- Finaled110
- Active42
- Issued21
- Not stated6
- Completed3
- Closed2
- Expired2
- Reviews in progress1
Also on file as
Spellings on its permits, combined into this profile because they work the same area:
- LGCY INSTALLATION SERVICES
- LGCY INSTALLATION SERVICES INC
The same name elsewhere
- LGCY Installation Services LLCLas Vegas city, NV697
- LGCY INSTALLATION SERVICES LLCDorchester County, SC456
- LGCY INSTALLATION SERVICES LLCKilleen city, TX272
- LGCY INSTALLATION SERVICES, LLCDuval County, FL170
- LGCY Installation Services, LLCElgin city, IL165
- LGCY INSTALLATION SERVICES LLCAnne Arundel County, MD50
- LGCY Installation Services LLCThornton city, CO31
- LGCY INSTALLATION SERVICES, LLCSt. Louis city, MO31
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.