Contractor · Electrical

SOUTH WEST BUILDERS

1,586 building permits since 2016 in Los Angeles city, CA; Riverside city, CA and Torrance city, CA, across 9 counties — $360,488 in reported job value over 27 permits that state one.

Building permits
1,586
Reported job value
$360.5K
Active
2016–2026
Latest permit
Mar 31, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA1.5K
  • Riverside city, CA18
  • Torrance city, CA10
  • Downey city, CA9
  • Ontario city, CA8
  • Anaheim city, CA4
  • Whittier city, CA4
  • San Bernardino County, CA3
  • Chino city, CA3
  • Moreno Valley city, CA3

Permits by year

By issue date (application date where there is none).

0400800
709
201620182020202220242026*
* 2026 is year to date.
View as table
YearPermits
20162
201766
201864
2019124
2020158
202137
2022709
2023151
20247
20252
2026 (YTD)265

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical1.6K
  • Solar263
  • Roofing38
  • Battery storage22
  • Additions7
  • Electric meters5

Permit types

As the building departments classify them.

  • Electrical1.6K
  • Residential18
  • Roofing5
  • Bldg-Alter/Repair4
  • BUILDING/SOLAR1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Mar 31, 2026RoofingRemove and reinstall existing roof mounted photovoltaic system under yl-0037853 with 20 panels, for reroof purposesYorba Linda City—
Mar 26, 2026ElectricalSolarapp+ - solar and storage 5.74kw and 14 panels; includes energy storage system 6 lf from property line. Energy storage systems shall comply with downey muniDowney City—
Mar 25, 2026ElectricalPhotovoltaic system: remove and reinstall solar (ref: bld2021-01803).Anaheim City—
Mar 25, 2026ElectricalPhotovoltaic system: remove solar and discontinue. (ref:bld2010-03026)Anaheim City—
Mar 25, 2026ElectricalInstall (9) photovoltaic solar panels (est 3.69kw) flush mount on roof; install energy storage system - (1) 5.0kwh enphase batteryTorrance City—
Mar 19, 2026ElectricalRooftop mounted solar energy system pv+st 9 q.peak duo blk ml-g10.c+ 410 solar modules 9 iq8hc-72-m-dom-us {240v} microinverters 1 iqbattery-5p-1p-na {240v} essWhittier City—
Mar 18, 2026ElectricalRooftop mounted solar energy system pv+st 9 q.peak duo blk ml-g10.c+ 410 solar modules 9 iq8hc-72-m-dom-us {240v} microinverters 1 iqbattery-5p-1p-na {240v} essInglewood City$20,000
Mar 16, 2026ElectricalSolarapp+ - install (28) panels roof mounted pv system (11.48 kw); new electrical panel (200 amp); (2) new battery storage (10 kwh); rev no.1 - update equipmentCupertino City—

Permit status

Where its permits stand, as the departments report them.

  • Not stated1.3K
  • Active183
  • Finaled84
  • Completed16
  • Expired1
  • Reviews complete1

Also on file as

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.