Contractor · Specialty (solar, fire, telecom)

Kaylan Watson

12 building permits since 2022 in Warren County, NC; Davie County, NC and Greene County, NC, across 5 counties — $290,090 in reported job value over 11 permits that state one.

Building permits
12
Reported job value
$290.1K
Active
2022–2026
Latest permit
Aug 14, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Warren County, NC5
  • Davie County, NC2
  • Greene County, NC2
  • Lenoir County, NC2
  • Gaston County, NC1

Permits by year

By issue date (application date where there is none).

036
6
2022202420252026*
* 2026 is year to date.
View as table
YearPermits
20221
20241
20254
2026 (YTD)6

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar10
  • Battery storage5
  • Electrical4
  • New construction2
  • Remodels1
  • Additions1

Permit types

As the building departments classify them.

  • Electrical Permit3
  • Solar Installation Permit2
  • Electric Permit Application1
  • Residential Addition Permit1
  • Residential Building Permit1
  • Residential Building Permit Application1
  • *Residential Remodel & Alteration Permit1
  • *Residential Solar Installation Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 14, 2026Residential Addition PermitInstallation of roof-mounted solar panel array via DOI opt 2Warren County$31,264
Apr 20, 2026Solar Installation PermitInstallation of roof-mounted solar panel array via DOI opt 2Greene County$51,352
Apr 20, 2026Solar Installation PermitInstallation of roof-mounted solar panel array via DOI opt 2Greene County$51,352
Feb 12, 2026Electric Permit ApplicationInstallation of roof-mounted PV Array via DOI/OPT 2 and installation of (1) Tesla Powerwall 3. Also, Same same-day utility reconnect inspection is needed for seLenoir County—
Feb 12, 2026Residential Building Permit ApplicationInstallation of roof-mounted PV Array via DOI/OPT 2 and installation of (1) Tesla Powerwall 3. Also, Same same-day utility reconnect inspection is needed for seLenoir County$41,258
Jan 29, 2026Electrical PermitInstallation of (1) Tesla Powerwall 3.Warren County$17,695
Nov 17, 2025Electrical Permitrunning (3) capped off 10/4 MC from attic to basement for future PV system before Sheetrock and Drywall finished in the new home.Warren County$2,700
Nov 17, 2025Electrical PermitNC Solar Now to handle electrical pre-wire for new construction home for future solar and battery installation.Warren County$2,700

Permit status

Where its permits stand, as the departments report them.

  • Completed9
  • Active3

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.