Contractor · Electrical
adriano Andrade
188 building permits since 2017 in Bristol town, RI; Warren town, RI and Pawtucket city, RI, across 8 counties — $1,555,251 in reported job value over 180 permits that state one.
- Building permits
- 188
- Reported job value
- $1.6M
- Active
- 2017–2026
- Latest permit
- Oct 28, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Bristol town, RI71
- Warren town, RI17
- Pawtucket city, RI16
- Barrington town, RI15
- Tiverton town, RI10
- Providence city, RI10
- East Providence city, RI9
- Lincoln town, RI6
- Middletown town, RI5
- Warwick city, RI3
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2017 | 1 |
| 2019 | 10 |
| 2020 | 28 |
| 2021 | 12 |
| 2022 | 19 |
| 2023 | 18 |
| 2024 | 36 |
| 2025 | 36 |
| 2026 (YTD) | 28 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical182
- Bathrooms40
- Kitchens29
- Electric meters28
- Remodels19
- Additions16
- HVAC8
- Pools & hot tubs7
- Accessory dwelling units6
- Demolition5
Permit types
As the building departments classify them.
- Electrical Permit175
- Building Permit5
- 2) Electrical Permit3
- ELECT.2
- ELECTRICAL1
- Mechanical Permit1
- Plumbing Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 28, 2026 | Electrical Permit | Rewire kitchen, to nec code, install under cabinet lights install living room outlets off kitchen demo generator interlock kit. Install 2 outside outlets and do | Bristol Town | $8,000 |
| Oct 21, 2026 | Electrical Permit | Install 3 gang meter socket on front building. One 100 amp disconnect for front building. Other disconnect to be installed on house in back 200 amp disconnect. | Warren Town | $5,500 |
| Oct 19, 2026 | Electrical Permit | Revamp existing service to a 200 amp with a 2gang meter socket one feeding the house another meter feeding the adu on the side. Mast service. Service panel in b | Warren Town | $5,800 |
| Oct 7, 2026 | Electrical Permit | run conduit from house into shed for sub panel to wire up pool equipment bond pool light | Bristol Town | $4,000 |
| Sep 24, 2026 | Electrical Permit | 2nd floor bathroom install new heat fan, add shower light and floor heat. Install new outlets for washer dryer. add toilet seat outlet. 1st floor bathroom insta | Providence City | $3,200 |
| Sep 22, 2026 | Electrical Permit | Change out main panel from a 20 circuit to a 40 circuit panel | Tiverton Town | $1,500 |
| Sep 18, 2026 | Electrical Permit | Install outlets for new basement knee wall install switches for 11 new waffer recess lights in basement ceiling | Tiverton Town | $2,800 |
| Sep 3, 2026 | Electrical Permit | Wire 1 bedroom. Bath, kitchen living area adu. Former garage. 100 amp panel located in bedroom | Warren Town | $8,500 |
Permit status
Where its permits stand, as the departments report them.
- Completed151
- Active32
- Finaled2
- Stop work ordered2
- Closed1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.