Contractor · HVAC
john k costa
12 building permits since 2019 in Foxborough town, MA; Canton town, MA and Marshfield town, MA, across 2 counties — $166,400 in reported job value over 12 permits that state one.
- Building permits
- 12
- Reported job value
- $166.4K
- Active
- 2019–2022
- Latest permit
- May 31, 2022
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Foxborough town, MA10
- Canton town, MA1
- Marshfield town, MA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2019 | 4 |
| 2020 | 6 |
| 2021 | 1 |
| 2022 | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- HVAC12
- New construction1
Permit types
As the building departments classify them.
- SHT MTL10
- Building Permit1
- Sheet Metal Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| May 31, 2022 | SHT MTL | Installation of a heating and air conditioning system | Foxborough Town | $30,000 |
| Sep 29, 2021 | SHT MTL | install heat and a/c two units new house. Rough and Final inspections required. | Foxborough Town | $18,000 |
| Dec 19, 2020 | Sheet Metal Permit | install a warm air heating and a/c system in the basement to heat the first floor and part of the basement | Marshfield Town | $6,000 |
| Sep 3, 2020 | SHT MTL | Installation of two heating and air conditioning systems with 1 system with zone dampers with associated ductwork, rough sealing and final inspection required. | Foxborough Town | $20,000 |
| Jun 15, 2020 | SHT MTL | installation of a two heating and air conditioning systems Manual J attached Rough and final inspections required. | Foxborough Town | $14,000 |
| Mar 10, 2020 | SHT MTL | Installation of a heat and a/c system | Foxborough Town | $10,500 |
| Jan 7, 2020 | SHT MTL | Installation of a warm air furnace with control A/C to heat and cool 1st and 2nd floor with zone dampers, with associated duct work. Rough and final inspections | Foxborough Town | $9,800 |
| Jan 7, 2020 | SHT MTL | Installation of a warm air furnace with central A/C to heat and cool 1st and 2nd floor with zone dampers and associated duct work. Rough and final inspections r | Foxborough Town | $9,800 |
Permit status
Where its permits stand, as the departments report them.
- Expired9
- Active2
- Issued1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.