Contractor · Electrical

JOHN GOUDIE ELECTRICAL CONTRACTOR INC

12 building permits since 2023 in Arlington County, VA and Howard County, MD, across 2 counties.

Building permits
12
Reported job value
—
Active
2023–2026
Latest permit
Jul 2, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Arlington County, VA11
  • Howard County, MD1

Permits by year

By issue date (application date where there is none).

036
6
2023202420252026*
* 2026 is year to date.
View as table
YearPermits
20236
20243
20251
2026 (YTD)2

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical12
  • EV chargers7
  • HVAC1
  • Remodels1
  • Additions1
  • Heat pumps1
  • Pools & hot tubs1

Permit types

As the building departments classify them.

  • Electrical11
  • Residential Electrical Addition Alteration Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jul 2, 2026Residential Electrical Addition Alteration PermitPool wiring- 2 pumps, 12 lights, heat pump, auto cover, air blower, GFIHoward County—
Apr 7, 2026ElectricalInstall a 60 amp, 240 volt circuit for new car chargerArlington County—
Jan 7, 2025Electrical-Install a 60 amp, 240 volt circuit for new car charger,Arlington County—
Sep 6, 2024ElectricalFurnish and install a 60-amp, double pole breaker in the existing electrical panel to feed the new wall charger.Arlington County—
Mar 6, 2024Electrical-Furnish and install a 60-amp, double pole breaker in the existing electrical panel to feed the new wall charger.Arlington County—
Feb 28, 2024Electrical-Furnish and install a 60 amp, double pole breaker in the existing electrical panel to feed the new wall charger.Arlington County—
Nov 14, 2023ElectricalFurnish, wire and install a 50-amp, 240-volt circuit from the electrical panel to the location on the new receptacle on exterior of the home.Arlington County—
Nov 14, 2023Electrical-Furnish, wire and install a 60-amp, 240-volt circuit for a Level 2 Charger.Arlington County—

Permit status

Where its permits stand, as the departments report them.

  • Finaled10
  • Issued1
  • Pending1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.