Contractor · Plumbing

Jessica Rounds

12 building permits since 2022 in Fauquier County, VA — $52,344 in reported job value over 12 permits that state one.

Building permits
12
Reported job value
$52.3K
Active
2022–2026
Latest permit
Mar 2, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Fauquier County, VA12

Permits by year

By issue date (application date where there is none).

02.55
5
20222023202420252026*
* 2026 is year to date.
View as table
YearPermits
20221
20232
20245
20253
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Plumbing11
  • Gas8
  • Water heaters6
  • Grading & excavation2
  • HVAC1
  • Pools & hot tubs1

Permit types

As the building departments classify them.

  • Building Permit12

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Mar 2, 2026Building PermitREPLACE EXISTING 40 GALLON 40K BTU NATURAL GAS WATER HEATER WITH NEW 40 GALLON 50K BTU NATURAL GAS WATER HEATER.Fauquier County$1,602
Aug 21, 2025Building PermitInstall new main line sewer line going out of the home. Install will include a 3” clean out located at the house, 3” clean out at the street and 35’ of scheduleFauquier County$6,633
Jun 25, 2025Building PermitWe shall connect existing natural gas line to existing pool heater.Fauquier County$529
May 21, 2025Building PermitREPLACE EXISTING 75 GALLON 76000 BTU NATURAL GAS WATER HEATER WITH NEW 75 GALLON 76000 BTU NATURAL GAS WATER HEATER.Fauquier County$1,500
Oct 17, 2024Building PermitREPLACE EXISTING 75 GALLON NATURAL GAS WATER HEATER WITH NEW 75 GALLON NATURAL GAS WATER HEATERFauquier County$4,420
Sep 17, 2024Building PermitExcavation from water meter to the house for r eplacement of existing water service.Fauquier County$3,601
Jul 2, 2024Building PermitReplace existing 75K BTU natural gas furnace with new 75K natural gas furnace. Like for LikeFauquier County$11,731
May 24, 2024Building PermitReplace existing 3/4" poly water service with 3/4" poly piping. Total run length is about 100' going from the crawlspace to existing water main.Fauquier County$4,782

Permit status

Where its permits stand, as the departments report them.

  • Completed11
  • Active1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.