Contractor · Electrical
Helmi Ali
12 building permits since 2024 in Stamford town, CT; Darien town, CT and Glastonbury town, CT, across 3 counties — $122,500 in reported job value over 10 permits that state one.
- Building permits
- 12
- Reported job value
- $122.5K
- Active
- 2024–2026
- Latest permit
- May 15, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Stamford town, CT7
- Darien town, CT2
- Glastonbury town, CT1
- Norwich town, CT1
- New Canaan town, CT1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2024 | 1 |
| 2025 | 9 |
| 2026 (YTD) | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical12
- HVAC5
- Kitchens4
- Bathrooms3
- Electric meters2
- Remodels1
- Plumbing1
- Water heaters1
- New construction1
Permit types
As the building departments classify them.
- Electrical Permit11
- Electrical Permit General1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| May 15, 2026 | Electrical Permit | Upgrade existing service from 100 amps to 200 amps | Stamford Town | $2,500 |
| Mar 19, 2026 | Electrical Permit | Conversion of single-family to two-family dwelling, scope of electrical work includes wiring, lighting, switches, receptacles and GFCI protection where required | Stamford Town | $20,000 |
| Dec 27, 2025 | Electrical Permit | 1st building - New 400 amp underground service, 4 meters with new wiring throughout 2nd building - 2 unit addiiton, 200 amp serivce and wiring throughout As per | Stamford Town | $30,000 |
| Dec 10, 2025 | Electrical Permit | Scope of work includes new 200 A three-phase service from the existing switchgear cubicle to the panel. General Power and lighting throughout. Install wiring fo | Stamford Town | $12,000 |
| Nov 18, 2025 | Electrical Permit | Rewire entire residence; install receptacles and wiring for HVAC, kitchen appliances, laundry, and full bathrooms on all floors * 6/15/26: Also doing smoke/co d | Darien Town | — |
| Nov 12, 2025 | Electrical Permit | Rewire entire residence and upgrade existing electrical service to 200A | Darien Town | — |
| Jul 9, 2025 | Electrical Permit | Electrical work for residential build-out. Scope includes installation of a new 200 A single-phase overhead service with outside meter and 40-circuit panel, bra | Norwich Town | $12,000 |
| May 28, 2025 | Electrical Permit | Electrical work for poke bowl restaurant. Including re-wiring for kitchen equipment, lighting, and required electrical systems for dining and service areas. | Stamford Town | $20,000 |
Permit status
Where its permits stand, as the departments report them.
- Active6
- Completed6
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.